MalaysiaProp
Sign in

Residensi Mesra

Kuala Muda, Kedah

Residensi Mesra in Kuala Muda, Kedah recorded 238 registered subsale transactions between 2021 and 2026, sized 753–1,410 sqft, with a median price of RM240k and a median PSF of RM232. All figures are real registered sales from NAPIC/JPPH — not asking prices.

Transactions

238 subsales
FloorPricePSFSizeDateType
2026
RM300,000RM361.96829 sqftJan-261 - 1 1/2 sty Terrace
RM250,000RM301.63829 sqftJan-261 - 1 1/2 sty Terrace
2025
RM310,000RM374.03829 sqftAug-251 - 1 1/2 sty Terrace
RM270,000RM325.76829 sqftJul-251 - 1 1/2 sty Terrace
RM320,000RM386.09829 sqftMay-251 - 1 1/2 sty Terrace
RM255,000RM307.67829 sqftMay-251 - 1 1/2 sty Terrace
2024
RM197,000RM261.46753 sqftJul-241 - 1 1/2 sty Terrace
RM299,000RM396.83753 sqftJun-242 - 2 1/2 sty Terrace
RM201,000RM266.76753 sqftJun-241 - 1 1/2 sty Terrace
RM197,000RM261.46753 sqftJun-241 - 1 1/2 sty Terrace
RM197,000RM237.69829 sqftJun-241 - 1 1/2 sty Terrace
RM304,000RM215.591,410 sqftMay-242 - 2 1/2 sty Terrace
RM299,000RM396.83753 sqftMay-242 - 2 1/2 sty Terrace
RM201,000RM266.76753 sqftMay-241 - 1 1/2 sty Terrace
RM197,000RM261.46753 sqftMay-241 - 1 1/2 sty Terrace
RM197,000RM261.46753 sqftMay-241 - 1 1/2 sty Terrace
RM449,000RM318.421,410 sqftApr-242 - 2 1/2 sty Terrace
RM302,000RM214.171,410 sqftApr-242 - 2 1/2 sty Terrace
RM302,000RM214.171,410 sqftApr-242 - 2 1/2 sty Terrace
RM299,000RM396.83753 sqftApr-241 - 1 1/2 sty Terrace
RM282,000RM374.27753 sqftApr-241 - 1 1/2 sty Terrace
RM240,000RM318.53753 sqftApr-241 - 1 1/2 sty Terrace
RM197,000RM261.46753 sqftApr-241 - 1 1/2 sty Terrace
RM197,000RM261.46753 sqftApr-241 - 1 1/2 sty Terrace
RM304,000RM215.591,410 sqftMar-242 - 2 1/2 sty Terrace
RM302,000RM214.171,410 sqftMar-242 - 2 1/2 sty Terrace
RM299,000RM396.83753 sqftMar-242 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftMar-242 - 2 1/2 sty Terrace
RM244,000RM173.041,410 sqftMar-242 - 2 1/2 sty Terrace
RM201,000RM266.76753 sqftMar-241 - 1 1/2 sty Terrace
RM197,000RM261.46753 sqftMar-241 - 1 1/2 sty Terrace
RM197,000RM261.46753 sqftMar-241 - 1 1/2 sty Terrace
RM197,000RM237.69829 sqftMar-241 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftMar-241 - 1 1/2 sty Terrace
RM410,000RM290.771,410 sqftFeb-242 - 2 1/2 sty Terrace
RM304,000RM215.591,410 sqftFeb-242 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftFeb-242 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftFeb-242 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftFeb-242 - 2 1/2 sty Terrace
RM283,000RM375.59753 sqftFeb-241 - 1 1/2 sty Terrace
RM265,000RM206.891,281 sqftFeb-242 - 2 1/2 sty Terrace
RM261,000RM346.4753 sqftFeb-241 - 1 1/2 sty Terrace
RM240,000RM318.53753 sqftFeb-241 - 1 1/2 sty Terrace
RM216,000RM286.67753 sqftFeb-241 - 1 1/2 sty Terrace
RM201,000RM266.76753 sqftFeb-241 - 1 1/2 sty Terrace
RM197,000RM261.46753 sqftFeb-241 - 1 1/2 sty Terrace
RM197,000RM237.69829 sqftFeb-241 - 1 1/2 sty Terrace
RM197,000RM237.69829 sqftFeb-241 - 1 1/2 sty Terrace
RM304,000RM215.591,410 sqftJan-242 - 2 1/2 sty Terrace
RM304,000RM215.591,410 sqftJan-242 - 2 1/2 sty Terrace
RM299,000RM396.83753 sqftJan-242 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftJan-242 - 2 1/2 sty Terrace
RM267,000RM354.36753 sqftJan-241 - 1 1/2 sty Terrace
RM224,000RM297.29753 sqftJan-241 - 1 1/2 sty Terrace
RM197,000RM261.46753 sqftJan-241 - 1 1/2 sty Terrace
2023
RM312,000RM376.44829 sqftDec-231 - 1 1/2 sty Terrace
RM309,000RM219.141,410 sqftDec-232 - 2 1/2 sty Terrace
RM304,000RM215.591,410 sqftDec-232 - 2 1/2 sty Terrace
RM293,000RM388.87753 sqftDec-231 - 1 1/2 sty Terrace
RM278,000RM368.96753 sqftDec-231 - 1 1/2 sty Terrace
RM240,000RM318.53753 sqftDec-231 - 1 1/2 sty Terrace
RM211,000RM254.58829 sqftDec-231 - 1 1/2 sty Terrace
RM201,000RM266.76753 sqftDec-231 - 1 1/2 sty Terrace
RM197,000RM261.46753 sqftDec-231 - 1 1/2 sty Terrace
RM197,000RM261.46753 sqftDec-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftDec-231 - 1 1/2 sty Terrace
RM351,000RM248.921,410 sqftNov-232 - 2 1/2 sty Terrace
RM309,000RM410.1753 sqftNov-231 - 1 1/2 sty Terrace
RM304,000RM215.591,410 sqftNov-232 - 2 1/2 sty Terrace
RM192,000RM231.65829 sqftOct-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftSep-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftSep-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftSep-231 - 1 1/2 sty Terrace
RM375,000RM265.941,410 sqftAug-232 - 2 1/2 sty Terrace
RM192,000RM231.65829 sqftAug-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftAug-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftAug-231 - 1 1/2 sty Terrace
RM329,000RM233.321,410 sqftJul-232 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftJul-232 - 2 1/2 sty Terrace
RM265,000RM319.73829 sqftJul-231 - 1 1/2 sty Terrace
RM255,000RM307.67829 sqftJul-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftJul-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftJul-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftJul-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftJul-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftJun-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftJun-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftJun-231 - 1 1/2 sty Terrace
RM299,000RM233.431,281 sqftMay-232 - 2 1/2 sty Terrace
RM211,000RM254.58829 sqftMay-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftMay-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftMay-231 - 1 1/2 sty Terrace
RM299,000RM212.051,410 sqftApr-232 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftApr-232 - 2 1/2 sty Terrace
RM259,000RM312.49829 sqftApr-231 - 1 1/2 sty Terrace
RM213,000RM256.99829 sqftApr-231 - 1 1/2 sty Terrace
RM211,000RM254.58829 sqftApr-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftApr-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftApr-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftApr-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftApr-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftApr-231 - 1 1/2 sty Terrace
RM299,000RM212.051,410 sqftMar-232 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftMar-232 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftMar-232 - 2 1/2 sty Terrace
RM213,000RM256.99829 sqftMar-231 - 1 1/2 sty Terrace
RM211,000RM254.58829 sqftMar-231 - 1 1/2 sty Terrace
RM211,000RM254.58829 sqftMar-231 - 1 1/2 sty Terrace
RM197,000RM237.69829 sqftMar-231 - 1 1/2 sty Terrace
RM195,000RM235.27829 sqftMar-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftMar-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftMar-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftMar-231 - 1 1/2 sty Terrace
RM329,000RM233.321,410 sqftFeb-232 - 2 1/2 sty Terrace
RM266,000RM320.94829 sqftFeb-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftFeb-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftFeb-231 - 1 1/2 sty Terrace
RM299,000RM212.051,410 sqftJan-232 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftJan-232 - 2 1/2 sty Terrace
RM290,000RM349.89829 sqftJan-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftJan-231 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftJan-231 - 1 1/2 sty Terrace
2022
RM413,000RM292.891,410 sqftDec-222 - 2 1/2 sty Terrace
RM299,000RM360.75829 sqftDec-221 - 1 1/2 sty Terrace
RM299,000RM212.051,410 sqftDec-222 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftDec-222 - 2 1/2 sty Terrace
RM275,000RM331.8829 sqftDec-221 - 1 1/2 sty Terrace
RM260,000RM313.7829 sqftDec-221 - 1 1/2 sty Terrace
RM211,000RM254.58829 sqftDec-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftDec-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftDec-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftDec-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftDec-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftDec-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftDec-221 - 1 1/2 sty Terrace
RM413,000RM292.891,410 sqftNov-222 - 2 1/2 sty Terrace
RM412,000RM292.181,410 sqftNov-222 - 2 1/2 sty Terrace
RM343,000RM243.251,410 sqftNov-222 - 2 1/2 sty Terrace
RM306,000RM369.2829 sqftNov-221 - 1 1/2 sty Terrace
RM299,000RM360.75829 sqftNov-221 - 1 1/2 sty Terrace
RM299,000RM212.051,410 sqftNov-222 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftNov-222 - 2 1/2 sty Terrace
RM277,000RM334.21829 sqftNov-221 - 1 1/2 sty Terrace
RM265,000RM319.73829 sqftNov-221 - 1 1/2 sty Terrace
RM259,000RM312.49829 sqftNov-221 - 1 1/2 sty Terrace
RM211,000RM254.58829 sqftNov-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftNov-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftNov-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftNov-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftNov-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftNov-221 - 1 1/2 sty Terrace
RM299,000RM212.051,410 sqftOct-222 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftOct-222 - 2 1/2 sty Terrace
RM261,000RM314.91829 sqftOct-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftOct-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftOct-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftOct-221 - 1 1/2 sty Terrace
RM414,000RM293.61,410 sqftSep-222 - 2 1/2 sty Terrace
RM329,000RM233.321,410 sqftSep-222 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftSep-222 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftSep-222 - 2 1/2 sty Terrace
RM299,000RM212.051,410 sqftSep-222 - 2 1/2 sty Terrace
RM284,000RM342.66829 sqftSep-221 - 1 1/2 sty Terrace
RM274,000RM330.59829 sqftSep-221 - 1 1/2 sty Terrace
RM265,000RM319.73829 sqftSep-221 - 1 1/2 sty Terrace
RM261,000RM314.91829 sqftSep-221 - 1 1/2 sty Terrace
RM260,000RM313.7829 sqftSep-221 - 1 1/2 sty Terrace
RM260,000RM313.7829 sqftSep-221 - 1 1/2 sty Terrace
RM249,000RM176.591,410 sqftSep-222 - 2 1/2 sty Terrace
RM248,000RM299.22829 sqftSep-221 - 1 1/2 sty Terrace
RM213,000RM256.99829 sqftSep-221 - 1 1/2 sty Terrace
RM211,000RM254.58829 sqftSep-221 - 1 1/2 sty Terrace
RM211,000RM254.58829 sqftSep-221 - 1 1/2 sty Terrace
RM197,000RM237.69829 sqftSep-221 - 1 1/2 sty Terrace
RM197,000RM237.69829 sqftSep-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftSep-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftSep-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftSep-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftSep-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftSep-221 - 1 1/2 sty Terrace
RM299,000RM212.051,410 sqftAug-222 - 2 1/2 sty Terrace
RM192,000RM231.65829 sqftAug-221 - 1 1/2 sty Terrace
RM192,000RM231.65829 sqftAug-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftJul-221 - 1 1/2 sty Terrace
RM319,000RM226.231,410 sqftMar-222 - 2 1/2 sty Terrace
RM289,000RM348.69829 sqftMar-221 - 1 1/2 sty Terrace
RM253,000RM305.25829 sqftMar-221 - 1 1/2 sty Terrace
RM180,000RM127.651,410 sqftFeb-222 - 2 1/2 sty Terrace
RM343,000RM243.251,410 sqftJan-222 - 2 1/2 sty Terrace
RM286,000RM345.07829 sqftJan-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftJan-221 - 1 1/2 sty Terrace
2021
RM290,000RM205.661,410 sqftDec-212 - 2 1/2 sty Terrace
RM180,000RM217.18829 sqftDec-211 - 1 1/2 sty Terrace
RM180,000RM127.651,410 sqftDec-212 - 2 1/2 sty Terrace
RM290,000RM205.661,410 sqftNov-212 - 2 1/2 sty Terrace
RM198,000RM238.89829 sqftNov-211 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftNov-211 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftOct-211 - 1 1/2 sty Terrace
RM319,000RM384.88829 sqftSep-211 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftSep-211 - 1 1/2 sty Terrace
RM290,000RM205.661,410 sqftAug-212 - 2 1/2 sty Terrace
RM198,000RM238.89829 sqftAug-211 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftAug-211 - 1 1/2 sty Terrace
RM290,000RM205.661,410 sqftJul-212 - 2 1/2 sty Terrace
RM246,000RM296.81829 sqftJul-212 - 2 1/2 sty Terrace
RM198,000RM238.89829 sqftJul-211 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftJul-211 - 1 1/2 sty Terrace
RM180,000RM127.651,410 sqftJul-212 - 2 1/2 sty Terrace
RM290,000RM349.89829 sqftMay-211 - 1 1/2 sty Terrace
RM290,000RM205.661,410 sqftMay-212 - 2 1/2 sty Terrace
RM215,000RM259.4829 sqftMay-211 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftMay-211 - 1 1/2 sty Terrace
RM343,000RM243.251,410 sqftApr-212 - 2 1/2 sty Terrace
RM310,000RM374.03829 sqftApr-211 - 1 1/2 sty Terrace
RM290,000RM349.89829 sqftApr-211 - 1 1/2 sty Terrace
RM290,000RM349.89829 sqftApr-212 - 2 1/2 sty Terrace
RM290,000RM205.661,410 sqftApr-212 - 2 1/2 sty Terrace
RM250,000RM301.63829 sqftApr-211 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftApr-211 - 1 1/2 sty Terrace
RM180,000RM127.651,410 sqftApr-212 - 2 1/2 sty Terrace
RM180,000RM127.651,410 sqftApr-212 - 2 1/2 sty Terrace
RM290,000RM349.89829 sqftMar-211 - 1 1/2 sty Terrace
RM290,000RM205.661,410 sqftMar-212 - 2 1/2 sty Terrace
RM290,000RM205.661,410 sqftMar-212 - 2 1/2 sty Terrace
RM245,000RM295.6829 sqftMar-211 - 1 1/2 sty Terrace
RM198,000RM238.89829 sqftMar-211 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftMar-211 - 1 1/2 sty Terrace
RM180,000RM127.651,410 sqftMar-211 - 1 1/2 sty Terrace
RM180,000RM127.651,410 sqftMar-212 - 2 1/2 sty Terrace
RM290,000RM349.89829 sqftFeb-212 - 2 1/2 sty Terrace
RM290,000RM205.661,410 sqftFeb-212 - 2 1/2 sty Terrace
RM290,000RM205.661,410 sqftFeb-212 - 2 1/2 sty Terrace
RM198,000RM238.89829 sqftFeb-211 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftFeb-211 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftFeb-211 - 1 1/2 sty Terrace
RM290,000RM205.661,410 sqftJan-212 - 2 1/2 sty Terrace
RM217,000RM261.82829 sqftJan-211 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftJan-211 - 1 1/2 sty Terrace
Recent Highest price Highest PSF

Frequently asked

What is the median price of Residensi Mesra?

The median registered subsale price at Residensi Mesra, Kuala Muda is RM240k (median PSF RM232), based on 238 transactions from 2021 to 2026. Source: NAPIC/JPPH.

Are these real sold prices for Residensi Mesra?

Yes — every row is an actual registered sale recorded by NAPIC/JPPH, not an asking or listing price, showing the floor level, price, price-per-sqft, size and month.