MalaysiaProp
Sign in

Puncak Alam

Kuala Selangor, Selangor

Puncak Alam in Kuala Selangor, Selangor recorded 466 registered subsale transactions between 2021 and 2026, sized 721–5,382 sqft, with a median price of RM400k and a median PSF of RM384. All figures are real registered sales from NAPIC/JPPH — not asking prices.

Transactions

466 subsales
FloorPricePSFSizeDateType
2026
RM173,000RM132.831,302 sqftFeb-262 - 2 1/2 sty Terrace
RM500,000RM426.161,173 sqftJan-26Cluster House
RM440,000RM421.421,044 sqftJan-26Cluster House
RM425,000RM362.241,173 sqftJan-26Cluster House
RM365,000RM311.11,173 sqftJan-26Cluster House
2025
RM367,000RM448.62818 sqftDec-251 - 1 1/2 sty Terrace
RM315,000RM424.12743 sqftNov-251 - 1 1/2 sty Terrace
RM470,000RM393.371,195 sqftOct-252 - 2 1/2 sty Terrace
RM430,000RM578.96743 sqftAug-251 - 1 1/2 sty Terrace
RM480,000RM564.47850 sqftJul-252 - 2 1/2 sty Terrace
RM450,000RM413.921,087 sqftJul-252 - 2 1/2 sty Semi-D
RM420,000RM394.131,066 sqftJul-25Cluster House
RM400,000RM417.54958 sqftJul-252 - 2 1/2 sty Terrace
RM400,000RM464.52861 sqftJul-252 - 2 1/2 sty Terrace
RM380,000RM356.61,066 sqftJul-25Cluster House
RM380,000RM441.29861 sqftMay-252 - 2 1/2 sty Terrace
RM348,000RM404.13861 sqftMay-252 - 2 1/2 sty Terrace
RM430,000RM505.68850 sqftApr-252 - 2 1/2 sty Terrace
RM380,000RM304.341,249 sqftApr-252 - 2 1/2 sty Terrace
RM345,000RM288.751,195 sqftApr-252 - 2 1/2 sty Terrace
RM470,000RM293.051,604 sqftJan-252 - 2 1/2 sty Terrace
RM440,000RM364.981,206 sqftJan-252 - 2 1/2 sty Terrace
2024
RM500,000RM580.64861 sqftDec-242 - 2 1/2 sty Terrace
RM310,000RM369.23840 sqftNov-241 - 1 1/2 sty Terrace
RM470,000RM383.021,227 sqftOct-242 - 2 1/2 sty Terrace
RM450,000RM430.991,044 sqftOct-24Cluster House
RM400,000RM437.19915 sqftOct-242 - 2 1/2 sty Terrace
RM365,000RM280.241,302 sqftOct-242 - 2 1/2 sty Terrace
RM600,000RM502.181,195 sqftSep-242 - 2 1/2 sty Terrace
RM500,000RM400.441,249 sqftSep-242 - 2 1/2 sty Terrace
RM450,000RM321.591,399 sqftSep-242 - 2 1/2 sty Terrace
RM450,000RM369.971,216 sqftSep-242 - 2 1/2 sty Terrace
RM420,000RM300.151,399 sqftSep-242 - 2 1/2 sty Terrace
RM410,000RM482.16850 sqftSep-242 - 2 1/2 sty Terrace
RM410,000RM392.681,044 sqftSep-24Cluster House
RM363,000RM347.671,044 sqftSep-24Cluster House
RM350,000RM396.54883 sqftSep-242 - 2 1/2 sty Terrace
RM341,000RM433.97786 sqftSep-242 - 2 1/2 sty Terrace
RM520,000RM352.631,475 sqftAug-24Cluster House
RM450,000RM354.291,270 sqftAug-242 - 2 1/2 sty Semi-D
RM360,000RM288.321,249 sqftAug-242 - 2 1/2 sty Terrace
RM370,000RM298.911,238 sqftJul-242 - 2 1/2 sty Terrace
RM495,000RM389.721,270 sqftJun-241 - 1 1/2 sty Semi-D
RM400,000RM375.371,066 sqftJun-24Cluster House
RM315,000RM361.29872 sqftJun-241 - 1 1/2 sty Terrace
RM550,000RM352.391,561 sqftMay-24Cluster House
RM450,000RM383.551,173 sqftMay-24Cluster House
RM420,000RM438.42958 sqftMay-242 - 2 1/2 sty Terrace
RM400,000RM320.361,249 sqftMay-242 - 2 1/2 sty Terrace
RM400,000RM320.361,249 sqftMay-242 - 2 1/2 sty Terrace
RM390,000RM407.1958 sqftMay-242 - 2 1/2 sty Terrace
RM390,000RM441.86883 sqftMay-242 - 2 1/2 sty Terrace
RM380,000RM441.29861 sqftMay-242 - 2 1/2 sty Terrace
RM355,000RM291.861,216 sqftMay-242 - 2 1/2 sty Terrace
Level GRM220,000RM305.06721 sqftMay-24Condo
RM440,000RM459.3958 sqftApr-242 - 2 1/2 sty Terrace
RM419,000RM321.711,302 sqftApr-242 - 2 1/2 sty Terrace
RM295,000RM397.19743 sqftApr-241 - 1 1/2 sty Terrace
RM700,000RM520.261,345 sqftMar-241 - 1 1/2 sty Terrace
RM675,000RM420.871,604 sqftMar-242 - 2 1/2 sty Terrace
RM550,000RM342.931,604 sqftMar-242 - 2 1/2 sty Terrace
RM457,000RM284.941,604 sqftMar-242 - 2 1/2 sty Terrace
RM450,000RM290.321,550 sqftMar-242 - 2 1/2 sty Terrace
RM420,000RM345.31,216 sqftMar-242 - 2 1/2 sty Terrace
RM400,000RM328.861,216 sqftMar-242 - 2 1/2 sty Terrace
RM400,000RM367.931,087 sqftMar-24Cluster House
RM370,000RM284.081,302 sqftMar-242 - 2 1/2 sty Terrace
RM360,000RM393.47915 sqftMar-241 - 1 1/2 sty Terrace
RM345,000RM416.25829 sqftMar-241 - 1 1/2 sty Terrace
RM323,000RM384.71840 sqftMar-241 - 1 1/2 sty Terrace
RM268,000RM315.17850 sqftMar-242 - 2 1/2 sty Terrace
RM535,000RM382.331,399 sqftFeb-242 - 2 1/2 sty Terrace
RM470,000RM545.81861 sqftFeb-242 - 2 1/2 sty Terrace
RM460,000RM392.071,173 sqftFeb-24Cluster House
RM458,000RM429.791,066 sqftFeb-24Cluster House
RM450,000RM334.451,345 sqftFeb-24Cluster House
RM435,000RM408.211,066 sqftFeb-242 - 2 1/2 sty Terrace
RM400,000RM488.96818 sqftFeb-241 - 1 1/2 sty Terrace
RM390,000RM476.74818 sqftFeb-241 - 1 1/2 sty Terrace
RM350,000RM416.87840 sqftFeb-241 - 1 1/2 sty Terrace
RM350,000RM416.87840 sqftFeb-241 - 1 1/2 sty Terrace
RM330,000RM444.32743 sqftFeb-241 - 1 1/2 sty Terrace
RM545,000RM349.191,561 sqftJan-24Cluster House
RM480,000RM564.47850 sqftJan-242 - 2 1/2 sty Terrace
RM440,000RM510.97861 sqftJan-242 - 2 1/2 sty Terrace
RM380,000RM464.52818 sqftJan-242 - 2 1/2 sty Terrace
RM370,000RM424.37872 sqftJan-241 - 1 1/2 sty Terrace
RM370,000RM429.68861 sqftJan-242 - 2 1/2 sty Terrace
RM360,000RM484.71743 sqftJan-241 - 1 1/2 sty Terrace
2023
RM530,000RM341.941,550 sqftDec-232 - 2 1/2 sty Terrace
RM500,000RM377.651,324 sqftDec-23Cluster House
RM430,000RM499.35861 sqftDec-232 - 2 1/2 sty Terrace
RM400,000RM417.54958 sqftDec-232 - 2 1/2 sty Terrace
RM400,000RM464.52861 sqftDec-232 - 2 1/2 sty Terrace
RM390,000RM458.64850 sqftDec-232 - 2 1/2 sty Terrace
RM370,000RM446.42829 sqftDec-231 - 1 1/2 sty Terrace
RM320,000RM430.86743 sqftDec-231 - 1 1/2 sty Terrace
RM500,000RM322.581,550 sqftNov-232 - 2 1/2 sty Terrace
RM499,000RM274.311,819 sqftNov-232 - 2 1/2 sty Terrace
RM450,000RM469.73958 sqftNov-232 - 2 1/2 sty Terrace
RM420,000RM500.25840 sqftNov-231 - 1 1/2 sty Terrace
RM380,000RM363.951,044 sqftNov-23Cluster House
RM350,000RM292.941,195 sqftNov-232 - 2 1/2 sty Terrace
RM350,000RM406.45861 sqftNov-232 - 2 1/2 sty Terrace
RM340,000RM394.84861 sqftNov-231 - 1 1/2 sty Terrace
RM500,000RM426.161,173 sqftOct-232 - 2 1/2 sty Terrace
RM450,000RM469.73958 sqftOct-232 - 2 1/2 sty Terrace
RM400,000RM417.54958 sqftOct-232 - 2 1/2 sty Terrace
RM380,000RM415.33915 sqftOct-232 - 2 1/2 sty Terrace
RM380,000RM430.53883 sqftOct-232 - 2 1/2 sty Terrace
RM642,000RM119.295,382 sqftSep-23Detached
RM500,000RM357.321,399 sqftSep-232 - 2 1/2 sty Terrace
RM500,000RM546.49915 sqftSep-232 - 2 1/2 sty Terrace
RM450,000RM286.351,572 sqftSep-232 - 2 1/2 sty Terrace
RM440,000RM346.421,270 sqftSep-23Cluster House
RM430,000RM448.86958 sqftSep-232 - 2 1/2 sty Terrace
RM420,000RM361.291,163 sqftSep-232 - 2 1/2 sty Terrace
RM400,000RM375.371,066 sqftSep-23Cluster House
RM340,000RM389.96872 sqftSep-231 - 1 1/2 sty Terrace
RM335,000RM389.03861 sqftSep-232 - 2 1/2 sty Terrace
RM800,000RM334.792,390 sqftAug-23Detached
RM500,000RM311.761,604 sqftAug-232 - 2 1/2 sty Terrace
RM450,000RM376.631,195 sqftAug-232 - 2 1/2 sty Terrace
RM400,000RM417.54958 sqftAug-232 - 2 1/2 sty Terrace
RM390,000RM470.55829 sqftAug-231 - 1 1/2 sty Terrace
RM370,000RM296.331,249 sqftAug-232 - 2 1/2 sty Terrace
RM360,000RM375.79958 sqftAug-232 - 2 1/2 sty Terrace
RM335,000RM393.96850 sqftAug-232 - 2 1/2 sty Terrace
RM330,000RM444.32743 sqftAug-231 - 1 1/2 sty Terrace
RM320,000RM334.03958 sqftAug-232 - 2 1/2 sty Terrace
RM480,000RM343.031,399 sqftJul-232 - 2 1/2 sty Terrace
RM480,000RM557.42861 sqftJul-232 - 2 1/2 sty Terrace
RM460,000RM534.19861 sqftJul-232 - 2 1/2 sty Terrace
RM450,000RM469.73958 sqftJul-232 - 2 1/2 sty Terrace
RM440,000RM274.341,604 sqftJul-232 - 2 1/2 sty Terrace
RM400,000RM437.19915 sqftJul-231 - 1 1/2 sty Terrace
RM380,000RM363.951,044 sqftJul-23Cluster House
RM369,000RM385.18958 sqftJul-232 - 2 1/2 sty Terrace
RM360,000RM393.47915 sqftJul-231 - 1 1/2 sty Terrace
RM350,000RM471.25743 sqftJul-231 - 1 1/2 sty Terrace
RM330,000RM344.47958 sqftJul-232 - 2 1/2 sty Terrace
RM500,000RM430.111,162 sqftJun-232 - 2 1/2 sty Terrace
RM490,000RM316.131,550 sqftJun-232 - 2 1/2 sty Terrace
RM440,000RM371.611,184 sqftJun-232 - 2 1/2 sty Terrace
RM425,000RM264.991,604 sqftJun-232 - 2 1/2 sty Terrace
RM420,000RM475.85883 sqftJun-232 - 2 1/2 sty Terrace
RM405,000RM488.65829 sqftJun-232 - 2 1/2 sty Terrace
RM400,000RM470.4850 sqftJun-232 - 2 1/2 sty Terrace
RM360,000RM434.35829 sqftJun-232 - 2 1/2 sty Terrace
RM340,000RM371.61915 sqftJun-231 - 1 1/2 sty Terrace
RM320,000RM334.03958 sqftJun-231 - 1 1/2 sty Terrace
RM300,000RM313.16958 sqftJun-232 - 2 1/2 sty Terrace
RM580,000RM414.491,399 sqftMay-232 - 2 1/2 sty Terrace
RM440,000RM337.831,302 sqftMay-232 - 2 1/2 sty Terrace
RM420,000RM322.471,302 sqftMay-232 - 2 1/2 sty Terrace
RM405,000RM338.971,195 sqftMay-232 - 2 1/2 sty Terrace
RM400,000RM464.52861 sqftMay-232 - 2 1/2 sty Terrace
RM400,000RM307.121,302 sqftMay-232 - 2 1/2 sty Terrace
RM380,000RM396.67958 sqftMay-232 - 2 1/2 sty Terrace
RM350,000RM365.35958 sqftMay-232 - 2 1/2 sty Terrace
RM330,000RM378.49872 sqftMay-231 - 1 1/2 sty Terrace
RM550,000RM418.831,313 sqftApr-232 - 2 1/2 sty Terrace
RM458,000RM295.481,550 sqftApr-232 - 2 1/2 sty Terrace
RM450,000RM469.73958 sqftApr-232 - 2 1/2 sty Terrace
RM395,000RM412.32958 sqftApr-232 - 2 1/2 sty Terrace
RM390,000RM452.9861 sqftApr-232 - 2 1/2 sty Terrace
RM356,000RM418.65850 sqftApr-232 - 2 1/2 sty Terrace
RM500,000RM393.661,270 sqftMar-23Cluster House
RM450,000RM376.631,195 sqftMar-232 - 2 1/2 sty Terrace
RM420,000RM351.531,195 sqftMar-232 - 2 1/2 sty Terrace
RM420,000RM351.531,195 sqftMar-232 - 2 1/2 sty Terrace
RM390,000RM299.441,302 sqftMar-232 - 2 1/2 sty Terrace
RM390,000RM332.411,173 sqftMar-23Cluster House
RM385,000RM368.741,044 sqftMar-23Cluster House
RM380,000RM323.881,173 sqftMar-232 - 2 1/2 sty Terrace
RM375,000RM300.331,249 sqftMar-232 - 2 1/2 sty Terrace
RM350,000RM406.45861 sqftMar-232 - 2 1/2 sty Terrace
RM350,000RM406.45861 sqftMar-232 - 2 1/2 sty Terrace
RM340,000RM371.61915 sqftMar-231 - 1 1/2 sty Terrace
RM555,000RM444.491,249 sqftFeb-232 - 2 1/2 sty Terrace
RM480,000RM409.111,173 sqftFeb-23Cluster House
RM465,000RM396.331,173 sqftFeb-232 - 2 1/2 sty Terrace
RM450,000RM550.08818 sqftFeb-232 - 2 1/2 sty Terrace
RM420,000RM487.74861 sqftFeb-232 - 2 1/2 sty Terrace
RM400,000RM320.361,249 sqftFeb-232 - 2 1/2 sty Terrace
RM370,000RM386.23958 sqftFeb-232 - 2 1/2 sty Terrace
RM370,000RM419.2883 sqftFeb-232 - 2 1/2 sty Terrace
RM340,000RM272.31,249 sqftFeb-232 - 2 1/2 sty Terrace
RM330,000RM316.061,044 sqftFeb-23Cluster House
RM550,000RM415.421,324 sqftJan-23Cluster House
RM460,000RM362.161,270 sqftJan-232 - 2 1/2 sty Terrace
RM390,000RM407.1958 sqftJan-232 - 2 1/2 sty Terrace
RM370,000RM414.15893 sqftJan-231 - 1 1/2 sty Terrace
RM370,000RM354.371,044 sqftJan-23Cluster House
RM350,000RM411.6850 sqftJan-232 - 2 1/2 sty Terrace
RM345,000RM416.25829 sqftJan-231 - 1 1/2 sty Terrace
RM300,000RM348.39861 sqftJan-232 - 2 1/2 sty Terrace
2022
RM520,000RM399.251,302 sqftDec-222 - 2 1/2 sty Terrace
RM490,000RM350.171,399 sqftDec-222 - 2 1/2 sty Terrace
RM450,000RM413.921,087 sqftDec-22Cluster House
RM430,000RM307.291,399 sqftDec-222 - 2 1/2 sty Terrace
RM390,000RM476.74818 sqftDec-222 - 2 1/2 sty Terrace
RM390,000RM452.9861 sqftDec-222 - 2 1/2 sty Terrace
RM375,000RM351.911,066 sqftDec-22Cluster House
RM370,000RM435.12850 sqftDec-222 - 2 1/2 sty Terrace
RM341,000RM396861 sqftDec-222 - 2 1/2 sty Terrace
RM320,000RM256.281,249 sqftDec-222 - 2 1/2 sty Terrace
RM500,000RM371.611,345 sqftNov-22Cluster House
RM450,000RM290.321,550 sqftNov-222 - 2 1/2 sty Terrace
RM435,000RM276.81,572 sqftNov-222 - 2 1/2 sty Terrace
RM400,000RM437.19915 sqftNov-222 - 2 1/2 sty Terrace
RM385,000RM295.61,302 sqftNov-222 - 2 1/2 sty Terrace
RM360,000RM309.681,162 sqftNov-222 - 2 1/2 sty Terrace
RM340,000RM438.71775 sqftNov-221 - 1 1/2 sty Terrace
RM817,000RM583.861,399 sqftOct-222 - 2 1/2 sty Terrace
RM743,000RM530.981,399 sqftOct-222 - 2 1/2 sty Terrace
RM490,000RM305.521,604 sqftOct-222 - 2 1/2 sty Terrace
RM450,000RM497.7904 sqftOct-222 - 2 1/2 sty Terrace
RM400,000RM538.57743 sqftOct-221 - 1 1/2 sty Terrace
RM400,000RM417.54958 sqftOct-222 - 2 1/2 sty Terrace
RM400,000RM383.111,044 sqftOct-22Cluster House
RM375,000RM458.4818 sqftOct-222 - 2 1/2 sty Terrace
RM375,000RM359.161,044 sqftOct-22Cluster House
RM330,000RM393.05840 sqftOct-221 - 1 1/2 sty Terrace
RM323,000RM379.84850 sqftOct-222 - 2 1/2 sty Terrace
RM310,000RM261.821,184 sqftOct-222 - 2 1/2 sty Terrace
RM680,000RM451.241,507 sqftSep-22Cluster House
RM570,000RM645.79883 sqftSep-222 - 2 1/2 sty Terrace
RM500,000RM274.861,819 sqftSep-222 - 2 1/2 sty Terrace
RM500,000RM469.211,066 sqftSep-22Cluster House
RM465,000RM553.85840 sqftSep-221 - 1 1/2 sty Terrace
RM425,000RM443.64958 sqftSep-222 - 2 1/2 sty Terrace
RM420,000RM322.471,302 sqftSep-222 - 2 1/2 sty Terrace
RM420,000RM386.331,087 sqftSep-22Cluster House
RM410,000RM314.81,302 sqftSep-222 - 2 1/2 sty Terrace
RM400,000RM470.4850 sqftSep-222 - 2 1/2 sty Terrace
RM350,000RM382.54915 sqftSep-221 - 1 1/2 sty Terrace
RM350,000RM401.43872 sqftSep-221 - 1 1/2 sty Terrace
RM278,000RM335.42829 sqftSep-221 - 1 1/2 sty Terrace
RM600,000RM511.391,173 sqftAug-22Cluster House
RM530,000RM378.761,399 sqftAug-222 - 2 1/2 sty Terrace
RM500,000RM311.761,604 sqftAug-222 - 2 1/2 sty Terrace
RM450,000RM529.2850 sqftAug-222 - 2 1/2 sty Terrace
RM450,000RM345.511,302 sqftAug-222 - 2 1/2 sty Terrace
RM430,000RM322.161,335 sqftAug-222 - 2 1/2 sty Terrace
RM430,000RM403.521,066 sqftAug-22Cluster House
RM410,000RM482.16850 sqftAug-222 - 2 1/2 sty Terrace
RM370,000RM424.37872 sqftAug-222 - 2 1/2 sty Terrace
RM360,000RM402.95893 sqftAug-221 - 1 1/2 sty Terrace
RM330,000RM276.21,195 sqftAug-222 - 2 1/2 sty Terrace
RM300,000RM361.96829 sqftAug-221 - 1 1/2 sty Terrace
RM475,000RM358.771,324 sqftJul-22Cluster House
RM450,000RM469.73958 sqftJul-222 - 2 1/2 sty Terrace
RM450,000RM469.73958 sqftJul-222 - 2 1/2 sty Terrace
RM450,000RM376.631,195 sqftJul-222 - 2 1/2 sty Terrace
RM430,000RM411.841,044 sqftJul-22Cluster House
RM400,000RM337.831,184 sqftJul-222 - 2 1/2 sty Terrace
RM390,000RM326.421,195 sqftJul-222 - 2 1/2 sty Terrace
RM370,000RM347.211,066 sqftJul-22Cluster House
RM360,000RM434.35829 sqftJul-222 - 2 1/2 sty Terrace
RM360,000RM276.411,302 sqftJul-222 - 2 1/2 sty Terrace
RM350,000RM427.84818 sqftJul-222 - 2 1/2 sty Terrace
RM350,000RM406.45861 sqftJul-222 - 2 1/2 sty Terrace
RM350,000RM298.311,173 sqftJul-22Cluster House
RM330,000RM378.49872 sqftJul-221 - 1 1/2 sty Terrace
RM330,000RM444.32743 sqftJul-221 - 1 1/2 sty Terrace
RM329,000RM76.414,306 sqftJul-22Detached
RM516,000RM317.471,625 sqftJun-221 - 1 1/2 sty Semi-D
RM490,000RM385.781,270 sqftJun-22Cluster House
RM460,000RM381.571,206 sqftJun-222 - 2 1/2 sty Terrace
RM455,000RM528.39861 sqftJun-222 - 2 1/2 sty Terrace
RM450,000RM383.551,173 sqftJun-222 - 2 1/2 sty Terrace
RM450,000RM376.631,195 sqftJun-222 - 2 1/2 sty Terrace
RM440,000RM337.831,302 sqftJun-222 - 2 1/2 sty Terrace
RM405,000RM289.431,399 sqftJun-222 - 2 1/2 sty Semi-D
RM405,000RM380.061,066 sqftJun-22Cluster House
RM385,000RM401.88958 sqftJun-222 - 2 1/2 sty Terrace
RM330,000RM398.16829 sqftJun-221 - 1 1/2 sty Terrace
RM330,000RM360.68915 sqftJun-221 - 1 1/2 sty Terrace
RM280,000RM337.83829 sqftJun-221 - 1 1/2 sty Terrace
RM648,000RM463.091,399 sqftMay-222 - 2 1/2 sty Terrace
RM420,000RM394.131,066 sqftMay-22Cluster House
RM390,000RM338.621,152 sqftMay-222 - 2 1/2 sty Terrace
RM390,000RM476.74818 sqftMay-222 - 2 1/2 sty Terrace
RM390,000RM312.351,249 sqftMay-222 - 2 1/2 sty Terrace
RM385,000RM325.161,184 sqftMay-222 - 2 1/2 sty Terrace
RM375,000RM359.161,044 sqftMay-22Cluster House
RM360,000RM434.35829 sqftMay-221 - 1 1/2 sty Terrace
RM330,000RM271.311,216 sqftMay-222 - 2 1/2 sty Terrace
RM310,000RM417.39743 sqftMay-221 - 1 1/2 sty Terrace
RM700,000RM378.091,851 sqftApr-222 - 2 1/2 sty Terrace
RM682,000RM487.381,399 sqftApr-222 - 2 1/2 sty Terrace
RM642,000RM458.81,399 sqftApr-222 - 2 1/2 sty Terrace
RM435,000RM370.761,173 sqftApr-222 - 2 1/2 sty Terrace
RM410,000RM476.13861 sqftApr-222 - 2 1/2 sty Terrace
RM400,000RM347.31,152 sqftApr-222 - 2 1/2 sty Terrace
RM400,000RM320.361,249 sqftApr-222 - 2 1/2 sty Terrace
RM380,000RM349.541,087 sqftApr-22Cluster House
RM350,000RM268.731,302 sqftApr-222 - 2 1/2 sty Terrace
RM350,000RM295.61,184 sqftApr-222 - 2 1/2 sty Terrace
RM340,000RM354.91958 sqftApr-222 - 2 1/2 sty Terrace
RM320,000RM376.32850 sqftApr-222 - 2 1/2 sty Terrace
RM320,000RM371.61861 sqftApr-222 - 2 1/2 sty Terrace
RM685,000RM383.371,787 sqftMar-222 - 2 1/2 sty Terrace
RM651,000RM465.231,399 sqftMar-222 - 2 1/2 sty Terrace
RM650,000RM416.461,561 sqftMar-22Cluster House
RM616,000RM440.221,399 sqftMar-222 - 2 1/2 sty Terrace
RM475,000RM302.251,572 sqftMar-222 - 2 1/2 sty Terrace
RM435,000RM367.391,184 sqftMar-222 - 2 1/2 sty Terrace
RM405,000RM345.191,173 sqftMar-222 - 2 1/2 sty Terrace
RM400,000RM328.861,216 sqftMar-222 - 2 1/2 sty Terrace
RM390,000RM329.381,184 sqftMar-222 - 2 1/2 sty Terrace
RM390,000RM373.531,044 sqftMar-22Cluster House
RM380,000RM396.67958 sqftMar-222 - 2 1/2 sty Terrace
RM370,000RM309.681,195 sqftMar-222 - 2 1/2 sty Terrace
RM350,000RM301.071,163 sqftMar-222 - 2 1/2 sty Terrace
RM330,000RM271.311,216 sqftMar-222 - 2 1/2 sty Terrace
RM304,000RM233.411,302 sqftMar-222 - 2 1/2 sty Terrace
RM300,000RM357.32840 sqftMar-221 - 1 1/2 sty Terrace
RM600,000RM480.531,249 sqftFeb-222 - 2 1/2 sty Terrace
RM560,000RM371.611,507 sqftFeb-221 - 1 1/2 sty Terrace
RM550,000RM378.491,453 sqftFeb-221 - 1 1/2 sty Semi-D
RM450,000RM422.291,066 sqftFeb-22Cluster House
RM430,000RM277.421,550 sqftFeb-222 - 2 1/2 sty Terrace
RM420,000RM300.151,399 sqftFeb-222 - 2 1/2 sty Terrace
RM350,000RM365.35958 sqftFeb-222 - 2 1/2 sty Terrace
RM340,000RM399.84850 sqftFeb-222 - 2 1/2 sty Terrace
RM470,000RM335.881,399 sqftJan-222 - 2 1/2 sty Terrace
RM450,000RM383.551,173 sqftJan-222 - 2 1/2 sty Terrace
RM450,000RM413.921,087 sqftJan-22Cluster House
RM430,000RM366.51,173 sqftJan-222 - 2 1/2 sty Terrace
RM400,000RM464.52861 sqftJan-222 - 2 1/2 sty Terrace
RM350,000RM301.071,163 sqftJan-222 - 2 1/2 sty Terrace
RM330,000RM403.4818 sqftJan-222 - 2 1/2 sty Terrace
2021
RM719,000RM513.831,399 sqftDec-212 - 2 1/2 sty Terrace
RM650,000RM678.51958 sqftDec-212 - 2 1/2 sty Terrace
RM642,000RM458.81,399 sqftDec-212 - 2 1/2 sty Terrace
RM616,000RM440.221,399 sqftDec-212 - 2 1/2 sty Terrace
RM480,000RM450.441,066 sqftDec-21Cluster House
RM470,000RM400.591,173 sqftDec-212 - 2 1/2 sty Terrace
RM460,000RM292.711,572 sqftDec-212 - 2 1/2 sty Terrace
RM430,000RM330.151,302 sqftDec-212 - 2 1/2 sty Terrace
RM400,000RM328.861,216 sqftDec-212 - 2 1/2 sty Terrace
RM390,000RM373.531,044 sqftDec-21Cluster House
RM360,000RM428.78840 sqftDec-211 - 1 1/2 sty Terrace
RM360,000RM458.15786 sqftDec-212 - 2 1/2 sty Terrace
RM350,000RM427.84818 sqftDec-212 - 2 1/2 sty Terrace
RM350,000RM365.35958 sqftDec-212 - 2 1/2 sty Terrace
RM345,000RM405.72850 sqftDec-212 - 2 1/2 sty Terrace
RM340,000RM279.531,216 sqftDec-212 - 2 1/2 sty Terrace
RM330,000RM393.05840 sqftDec-211 - 1 1/2 sty Terrace
RM330,000RM383.23861 sqftDec-212 - 2 1/2 sty Terrace
RM300,000RM327.89915 sqftDec-211 - 1 1/2 sty Terrace
RM870,000RM621.741,399 sqftNov-212 - 2 1/2 sty Terrace
RM719,000RM513.831,399 sqftNov-212 - 2 1/2 sty Terrace
RM692,000RM494.531,399 sqftNov-212 - 2 1/2 sty Terrace
RM682,000RM487.381,399 sqftNov-212 - 2 1/2 sty Terrace
RM655,000RM468.091,399 sqftNov-212 - 2 1/2 sty Terrace
RM642,000RM458.81,399 sqftNov-212 - 2 1/2 sty Terrace
RM616,000RM440.221,399 sqftNov-212 - 2 1/2 sty Terrace
RM551,000RM393.771,399 sqftNov-212 - 2 1/2 sty Terrace
RM500,000RM377.651,324 sqftNov-21Cluster House
RM450,000RM280.581,604 sqftNov-212 - 2 1/2 sty Terrace
RM430,000RM487.17883 sqftNov-212 - 2 1/2 sty Terrace
RM415,000RM305.991,356 sqftNov-212 - 2 1/2 sty Terrace
RM400,000RM334.791,195 sqftNov-212 - 2 1/2 sty Terrace
RM380,000RM312.421,216 sqftNov-212 - 2 1/2 sty Terrace
RM380,000RM363.951,044 sqftNov-21Cluster House
RM360,000RM418.06861 sqftNov-212 - 2 1/2 sty Terrace
RM360,000RM232.261,550 sqftNov-212 - 2 1/2 sty Terrace
RM360,000RM290.831,238 sqftNov-212 - 2 1/2 sty Terrace
RM320,000RM263.091,216 sqftNov-212 - 2 1/2 sty Terrace
RM300,000RM361.96829 sqftNov-211 - 1 1/2 sty Terrace
RM300,000RM357.32840 sqftNov-211 - 1 1/2 sty Terrace
RM280,000RM377743 sqftNov-211 - 1 1/2 sty Terrace
RM270,000RM330.05818 sqftNov-211 - 1 1/2 sty Terrace
RM733,000RM523.831,399 sqftOct-212 - 2 1/2 sty Terrace
RM682,000RM487.381,399 sqftOct-212 - 2 1/2 sty Terrace
RM655,000RM468.091,399 sqftOct-212 - 2 1/2 sty Terrace
RM651,000RM465.231,399 sqftOct-212 - 2 1/2 sty Terrace
RM642,000RM458.81,399 sqftOct-212 - 2 1/2 sty Terrace
RM616,000RM440.221,399 sqftOct-212 - 2 1/2 sty Terrace
RM490,000RM350.171,399 sqftOct-212 - 2 1/2 sty Terrace
RM480,000RM459.731,044 sqftOct-21Cluster House
RM445,000RM379.281,173 sqftOct-212 - 2 1/2 sty Terrace
RM430,000RM307.291,399 sqftOct-212 - 2 1/2 sty Terrace
RM420,000RM342.271,227 sqftOct-212 - 2 1/2 sty Terrace
RM410,000RM427.98958 sqftOct-212 - 2 1/2 sty Terrace
RM400,000RM417.54958 sqftOct-212 - 2 1/2 sty Terrace
RM370,000RM452.29818 sqftOct-212 - 2 1/2 sty Terrace
RM370,000RM435.12850 sqftOct-212 - 2 1/2 sty Terrace
RM364,000RM84.544,306 sqftOct-21Detached
RM350,000RM411.6850 sqftOct-212 - 2 1/2 sty Terrace
RM350,000RM280.311,249 sqftOct-212 - 2 1/2 sty Terrace
RM335,000RM393.96850 sqftOct-212 - 2 1/2 sty Terrace
RM330,000RM383.23861 sqftOct-212 - 2 1/2 sty Terrace
RM320,000RM381.14840 sqftOct-211 - 1 1/2 sty Terrace
RM942,000RM508.811,851 sqftSep-212 - 2 1/2 sty Terrace
RM940,000RM507.731,851 sqftSep-212 - 2 1/2 sty Terrace
RM850,000RM456.461,862 sqftSep-212 - 2 1/2 sty Semi-D
RM775,000RM418.61,851 sqftSep-212 - 2 1/2 sty Terrace
RM773,000RM417.521,851 sqftSep-212 - 2 1/2 sty Terrace
RM655,000RM468.091,399 sqftSep-212 - 2 1/2 sty Terrace
RM616,000RM440.221,399 sqftSep-212 - 2 1/2 sty Terrace
RM490,000RM370.11,324 sqftSep-21Cluster House
RM480,000RM356.751,345 sqftSep-21Cluster House
RM435,000RM408.211,066 sqftSep-21Cluster House
RM420,000RM270.971,550 sqftSep-212 - 2 1/2 sty Terrace
RM415,000RM296.581,399 sqftSep-212 - 2 1/2 sty Terrace
RM412,000RM450.31915 sqftSep-212 - 2 1/2 sty Terrace
RM400,000RM422.29947 sqftSep-212 - 2 1/2 sty Terrace
RM390,000RM452.9861 sqftSep-212 - 2 1/2 sty Terrace
RM390,000RM312.351,249 sqftSep-212 - 2 1/2 sty Terrace
RM390,000RM332.411,173 sqftSep-21Cluster House
RM365,000RM429.24850 sqftSep-212 - 2 1/2 sty Terrace
RM360,000RM380.06947 sqftSep-212 - 2 1/2 sty Terrace
RM340,000RM272.31,249 sqftSep-212 - 2 1/2 sty Terrace
RM330,000RM360.68915 sqftSep-211 - 1 1/2 sty Terrace
RM330,000RM388.08850 sqftSep-212 - 2 1/2 sty Terrace
RM320,000RM349.75915 sqftSep-211 - 1 1/2 sty Terrace
RM300,000RM387.1775 sqftSep-211 - 1 1/2 sty Terrace
RM264,000RM318.53829 sqftSep-211 - 1 1/2 sty Terrace
RM904,000RM646.031,399 sqftAug-212 - 2 1/2 sty Terrace
RM700,000RM378.091,851 sqftAug-212 - 2 1/2 sty Terrace
RM692,000RM494.531,399 sqftAug-212 - 2 1/2 sty Terrace
RM634,000RM453.081,399 sqftAug-212 - 2 1/2 sty Terrace
RM455,000RM364.41,249 sqftAug-212 - 2 1/2 sty Terrace
RM400,000RM375.371,066 sqftAug-21Cluster House
RM378,000RM354.721,066 sqftAug-21Cluster House
RM340,000RM415.62818 sqftAug-211 - 1 1/2 sty Terrace
RM291,000RM180.231,615 sqftAug-21Detached
RM285,000RM339.45840 sqftAug-211 - 1 1/2 sty Terrace
RM270,000RM295.1915 sqftAug-211 - 1 1/2 sty Terrace
RM1,042,000RM744.651,399 sqftJul-212 - 2 1/2 sty Terrace
RM914,000RM493.681,851 sqftJul-212 - 2 1/2 sty Terrace
RM719,000RM513.831,399 sqftJul-212 - 2 1/2 sty Terrace
RM708,000RM505.961,399 sqftJul-212 - 2 1/2 sty Terrace
RM655,000RM468.091,399 sqftJul-212 - 2 1/2 sty Terrace
RM642,000RM458.81,399 sqftJul-212 - 2 1/2 sty Terrace
RM616,000RM440.221,399 sqftJul-212 - 2 1/2 sty Terrace
RM550,000RM623.13883 sqftJul-212 - 2 1/2 sty Terrace
RM450,000RM383.551,173 sqftJul-21Cluster House
RM411,000RM323.591,270 sqftJul-212 - 2 1/2 sty Terrace
RM410,000RM349.451,173 sqftJul-21Cluster House
RM400,000RM328.861,216 sqftJul-212 - 2 1/2 sty Terrace
RM280,000RM337.83829 sqftJul-211 - 1 1/2 sty Terrace
RM335,000RM282.931,184 sqftJun-212 - 2 1/2 sty Terrace
RM285,000RM326.88872 sqftJun-211 - 1 1/2 sty Terrace
RM1,600,000RM297.295,382 sqftMay-21Detached
RM648,000RM463.091,399 sqftMay-212 - 2 1/2 sty Terrace
RM400,000RM375.371,066 sqftMay-21Cluster House
RM380,000RM318.051,195 sqftMay-212 - 2 1/2 sty Terrace
RM355,000RM302.571,173 sqftMay-21Cluster House
RM320,000RM371.61861 sqftMay-212 - 2 1/2 sty Terrace
RM607,000RM433.791,399 sqftApr-212 - 2 1/2 sty Terrace
RM510,000RM358.941,421 sqftApr-212 - 2 1/2 sty Terrace
RM350,000RM427.84818 sqftApr-212 - 2 1/2 sty Terrace
RM350,000RM365.35958 sqftApr-212 - 2 1/2 sty Terrace
RM370,000RM296.331,249 sqftMar-212 - 2 1/2 sty Terrace
RM350,000RM406.45861 sqftMar-212 - 2 1/2 sty Terrace
RM350,000RM321.941,087 sqftMar-21Cluster House
RM300,000RM348.39861 sqftMar-212 - 2 1/2 sty Terrace
RM400,000RM340.931,173 sqftFeb-21Cluster House
RM270,000RM330.05818 sqftFeb-211 - 1 1/2 sty Terrace
RM350,000RM295.61,184 sqftJan-212 - 2 1/2 sty Terrace
RM310,000RM254.871,216 sqftJan-212 - 2 1/2 sty Terrace
Recent Highest price Highest PSF

Frequently asked

What is the median price of Puncak Alam?

The median registered subsale price at Puncak Alam, Kuala Selangor is RM400k (median PSF RM384), based on 466 transactions from 2021 to 2026. Source: NAPIC/JPPH.

Are these real sold prices for Puncak Alam?

Yes — every row is an actual registered sale recorded by NAPIC/JPPH, not an asking or listing price, showing the floor level, price, price-per-sqft, size and month.