Taman Rimbayu in Kuala Langat, Selangor recorded 332 registered subsale transactions between 2021 and 2026, sized 764–2,551 sqft, with a median price of RM763k and a median PSF of RM473. All figures are real registered sales from NAPIC/JPPH — not asking prices.

Transactions

332 subsales
FloorPricePSFSizeDateType
2026
RM888,000RM450.811,970 sqftFeb-262 - 2 1/2 sty Terrace
RM1,000,000RM436.162,293 sqftJan-262 - 2 1/2 sty Terrace
RM699,000RM507.341,378 sqftJan-262 - 2 1/2 sty Terrace
RM680,000RM311.22,185 sqftJan-262 - 2 1/2 sty Terrace
2025
RM1,429,000RM1037.181,378 sqftNov-252 - 2 1/2 sty Terrace
RM858,000RM622.741,378 sqftNov-252 - 2 1/2 sty Terrace
RM996,000RM547.521,819 sqftOct-252 - 2 1/2 sty Terrace
RM738,000RM405.71,819 sqftOct-252 - 2 1/2 sty Terrace
RM730,000RM529.841,378 sqftOct-252 - 2 1/2 sty Terrace
RM800,000RM395.332,024 sqftJul-252 - 2 1/2 sty Terrace
RM800,000RM395.332,024 sqftJul-252 - 2 1/2 sty Terrace
RM750,000RM535.981,399 sqftJul-252 - 2 1/2 sty Terrace
RM686,000RM448.811,528 sqftJul-252 - 2 1/2 sty Terrace
RM681,000RM494.271,378 sqftMay-252 - 2 1/2 sty Terrace
RM1,300,000RM659.971,970 sqftApr-252 - 2 1/2 sty Terrace
RM875,000RM459.271,905 sqftApr-252 - 2 1/2 sty Terrace
RM742,000RM538.551,378 sqftApr-252 - 2 1/2 sty Terrace
RM620,000RM4501,378 sqftApr-252 - 2 1/2 sty Terrace
RM1,300,000RM667.261,948 sqftJan-25Cluster House
RM830,000RM379.852,185 sqftJan-252 - 2 1/2 sty Terrace
2024
RM864,000RM557.421,550 sqftNov-242 - 2 1/2 sty Terrace
RM730,000RM360.742,024 sqftOct-242 - 2 1/2 sty Terrace
RM1,080,000RM434.352,486 sqftSep-242 - 2 1/2 sty Terrace
RM750,000RM370.622,024 sqftSep-242 - 2 1/2 sty Terrace
RM700,000RM457.971,528 sqftSep-242 - 2 1/2 sty Terrace
RM1,600,000RM821.241,948 sqftAug-24Cluster House
RM1,100,000RM564.61,948 sqftAug-24Cluster House
RM1,000,000RM513.281,948 sqftAug-24Cluster House
RM750,000RM544.351,378 sqftAug-242 - 2 1/2 sty Terrace
RM730,000RM529.841,378 sqftAug-242 - 2 1/2 sty Terrace
RM1,250,000RM641.61,948 sqftJul-24Cluster House
RM887,000RM450.31,970 sqftJul-242 - 2 1/2 sty Terrace
RM685,000RM448.161,528 sqftJul-242 - 2 1/2 sty Terrace
Level 3RM200,000RM261.7764 sqftJul-24Condo
Level 3RM180,000RM235.53764 sqftJul-24Condo
RM750,000RM370.622,024 sqftJun-242 - 2 1/2 sty Terrace
RM950,000RM482.281,970 sqftMay-242 - 2 1/2 sty Terrace
RM760,000RM425.341,787 sqftMay-242 - 2 1/2 sty Terrace
RM680,000RM493.551,378 sqftMay-242 - 2 1/2 sty Terrace
RM900,000RM444.752,024 sqftApr-242 - 2 1/2 sty Terrace
RM820,000RM405.222,024 sqftApr-242 - 2 1/2 sty Terrace
RM698,000RM506.611,378 sqftApr-242 - 2 1/2 sty Terrace
RM650,000RM471.771,378 sqftApr-242 - 2 1/2 sty Terrace
RM1,400,000RM607.782,303 sqftFeb-242 - 2 1/2 sty Terrace
RM1,160,000RM588.891,970 sqftFeb-242 - 2 1/2 sty Terrace
RM966,000RM701.131,378 sqftFeb-242 - 2 1/2 sty Terrace
RM880,000RM396.872,217 sqftFeb-242 - 2 1/2 sty Terrace
RM760,000RM551.611,378 sqftFeb-242 - 2 1/2 sty Terrace
RM1,071,000RM777.341,378 sqftJan-242 - 2 1/2 sty Terrace
RM1,000,000RM436.162,293 sqftJan-242 - 2 1/2 sty Terrace
RM750,000RM544.351,378 sqftJan-242 - 2 1/2 sty Terrace
RM665,000RM328.622,024 sqftJan-242 - 2 1/2 sty Terrace
2023
RM710,000RM515.321,378 sqftDec-232 - 2 1/2 sty Terrace
RM1,110,000RM481.882,303 sqftNov-232 - 2 1/2 sty Terrace
RM1,050,000RM518.872,024 sqftNov-232 - 2 1/2 sty Terrace
RM750,000RM544.351,378 sqftNov-232 - 2 1/2 sty Terrace
RM1,600,000RM821.241,948 sqftOct-23Cluster House
RM1,030,000RM678.651,518 sqftOct-232 - 2 1/2 sty Terrace
RM1,000,000RM513.281,948 sqftOct-23Cluster House
RM968,000RM491.421,970 sqftOct-232 - 2 1/2 sty Terrace
RM950,000RM498.631,905 sqftOct-232 - 2 1/2 sty Semi-D
RM838,000RM328.492,551 sqftOct-232 - 2 1/2 sty Terrace
RM765,000RM555.241,378 sqftOct-232 - 2 1/2 sty Terrace
RM760,000RM331.492,293 sqftOct-232 - 2 1/2 sty Terrace
RM695,000RM406.091,711 sqftOct-232 - 2 1/2 sty Terrace
RM690,000RM500.811,378 sqftOct-232 - 2 1/2 sty Terrace
RM670,000RM486.291,378 sqftOct-232 - 2 1/2 sty Terrace
RM1,360,000RM672.072,024 sqftSep-23Cluster House
RM1,150,000RM603.611,905 sqftSep-232 - 2 1/2 sty Semi-D
RM1,100,000RM442.42,486 sqftSep-232 - 2 1/2 sty Terrace
RM825,000RM407.692,024 sqftSep-232 - 2 1/2 sty Terrace
RM770,000RM363.122,121 sqftSep-232 - 2 1/2 sty Terrace
RM715,000RM518.951,378 sqftSep-232 - 2 1/2 sty Terrace
RM665,000RM328.622,024 sqftSep-232 - 2 1/2 sty Terrace
RM900,000RM444.752,024 sqftAug-232 - 2 1/2 sty Terrace
RM745,000RM540.731,378 sqftAug-232 - 2 1/2 sty Terrace
RM745,000RM368.152,024 sqftAug-232 - 2 1/2 sty Terrace
RM730,000RM401.31,819 sqftAug-232 - 2 1/2 sty Terrace
RM880,000RM402.732,185 sqftJul-232 - 2 1/2 sty Terrace
RM820,000RM416.291,970 sqftJul-232 - 2 1/2 sty Terrace
RM810,000RM400.272,024 sqftJul-232 - 2 1/2 sty Terrace
RM670,000RM486.291,378 sqftJul-232 - 2 1/2 sty Terrace
RM1,300,000RM667.261,948 sqftJun-23Cluster House
RM900,000RM444.752,024 sqftJun-232 - 2 1/2 sty Terrace
RM750,000RM544.351,378 sqftJun-232 - 2 1/2 sty Terrace
RM685,000RM497.181,378 sqftJun-232 - 2 1/2 sty Terrace
RM680,000RM336.032,024 sqftJun-232 - 2 1/2 sty Terrace
RM650,000RM357.321,819 sqftJun-232 - 2 1/2 sty Terrace
RM780,000RM343.432,271 sqftMay-232 - 2 1/2 sty Terrace
RM690,000RM493.11,399 sqftApr-232 - 2 1/2 sty Terrace
RM680,000RM493.551,378 sqftApr-232 - 2 1/2 sty Terrace
RM920,000RM464.521,981 sqftMar-232 - 2 1/2 sty Terrace
RM880,000RM437.192,013 sqftMar-232 - 2 1/2 sty Terrace
RM730,000RM360.742,024 sqftMar-232 - 2 1/2 sty Terrace
RM725,000RM358.272,024 sqftMar-232 - 2 1/2 sty Terrace
RM704,000RM510.971,378 sqftMar-232 - 2 1/2 sty Terrace
RM1,338,000RM679.261,970 sqftFeb-232 - 2 1/2 sty Terrace
RM1,080,000RM545.31,981 sqftFeb-232 - 2 1/2 sty Terrace
RM940,000RM482.481,948 sqftFeb-23Cluster House
RM815,000RM402.742,024 sqftFeb-232 - 2 1/2 sty Terrace
RM770,000RM352.392,185 sqftFeb-232 - 2 1/2 sty Terrace
RM750,000RM370.622,024 sqftFeb-232 - 2 1/2 sty Terrace
RM699,000RM507.341,378 sqftFeb-232 - 2 1/2 sty Terrace
RM688,000RM378.211,819 sqftJan-232 - 2 1/2 sty Terrace
RM650,000RM321.212,024 sqftJan-232 - 2 1/2 sty Terrace
2022
RM820,000RM329.792,486 sqftDec-222 - 2 1/2 sty Terrace
RM810,000RM415.751,948 sqftDec-22Cluster House
RM600,000RM435.481,378 sqftDec-222 - 2 1/2 sty Terrace
RM1,250,000RM631.141,981 sqftNov-222 - 2 1/2 sty Terrace
RM1,250,000RM4902,551 sqftNov-222 - 2 1/2 sty Terrace
RM970,000RM509.131,905 sqftNov-22Cluster House
RM920,000RM482.891,905 sqftNov-222 - 2 1/2 sty Semi-D
RM765,000RM350.12,185 sqftNov-222 - 2 1/2 sty Terrace
RM760,000RM347.812,185 sqftNov-222 - 2 1/2 sty Terrace
RM730,000RM360.742,024 sqftNov-222 - 2 1/2 sty Terrace
RM1,400,000RM718.591,948 sqftOct-222 - 2 1/2 sty Semi-D
RM1,050,000RM530.151,981 sqftOct-222 - 2 1/2 sty Terrace
RM1,000,000RM658.891,518 sqftOct-222 - 2 1/2 sty Terrace
RM1,000,000RM507.671,970 sqftOct-222 - 2 1/2 sty Terrace
RM960,000RM492.751,948 sqftOct-222 - 2 1/2 sty Semi-D
RM908,000RM460.961,970 sqftOct-222 - 2 1/2 sty Terrace
RM785,000RM387.922,024 sqftOct-222 - 2 1/2 sty Terrace
RM770,000RM339.032,271 sqftOct-222 - 2 1/2 sty Terrace
RM765,000RM333.672,293 sqftOct-222 - 2 1/2 sty Terrace
RM750,000RM370.622,024 sqftOct-222 - 2 1/2 sty Terrace
RM720,000RM477.791,507 sqftOct-222 - 2 1/2 sty Terrace
RM685,000RM497.181,378 sqftOct-222 - 2 1/2 sty Terrace
RM950,000RM412.422,303 sqftSep-222 - 2 1/2 sty Terrace
RM940,000RM408.082,303 sqftSep-222 - 2 1/2 sty Terrace
RM920,000RM457.062,013 sqftSep-222 - 2 1/2 sty Terrace
RM700,000RM274.42,551 sqftSep-222 - 2 1/2 sty Terrace
RM660,000RM362.821,819 sqftSep-222 - 2 1/2 sty Terrace
RM1,277,000RM554.382,303 sqftAug-222 - 2 1/2 sty Terrace
RM920,000RM482.891,905 sqftAug-222 - 2 1/2 sty Semi-D
RM868,000RM431.232,013 sqftAug-222 - 2 1/2 sty Terrace
RM852,000RM423.282,013 sqftAug-222 - 2 1/2 sty Terrace
RM840,000RM417.322,013 sqftAug-222 - 2 1/2 sty Terrace
RM790,000RM405.491,948 sqftAug-222 - 2 1/2 sty Terrace
RM755,000RM373.12,024 sqftAug-222 - 2 1/2 sty Terrace
RM750,000RM343.242,185 sqftAug-222 - 2 1/2 sty Terrace
RM720,000RM355.82,024 sqftAug-222 - 2 1/2 sty Terrace
RM700,000RM274.42,551 sqftAug-222 - 2 1/2 sty Terrace
RM700,000RM345.922,024 sqftAug-222 - 2 1/2 sty Terrace
RM665,000RM328.622,024 sqftAug-222 - 2 1/2 sty Terrace
RM1,240,000RM636.461,948 sqftJul-222 - 2 1/2 sty Semi-D
RM1,100,000RM442.42,486 sqftJul-222 - 2 1/2 sty Terrace
RM900,000RM477.791,884 sqftJul-222 - 2 1/2 sty Semi-D
RM800,000RM366.122,185 sqftJul-222 - 2 1/2 sty Terrace
RM720,000RM355.82,024 sqftJul-222 - 2 1/2 sty Terrace
RM700,000RM508.061,378 sqftJul-222 - 2 1/2 sty Terrace
RM680,000RM429.761,582 sqftJul-222 - 2 1/2 sty Terrace
RM610,000RM335.331,819 sqftJul-222 - 2 1/2 sty Terrace
RM1,100,000RM477.542,303 sqftJun-222 - 2 1/2 sty Terrace
RM920,000RM472.211,948 sqftJun-22Cluster House
RM888,000RM441.172,013 sqftJun-222 - 2 1/2 sty Terrace
RM810,000RM400.272,024 sqftJun-222 - 2 1/2 sty Terrace
RM789,000RM389.92,024 sqftJun-222 - 2 1/2 sty Terrace
RM780,000RM436.531,787 sqftJun-222 - 2 1/2 sty Terrace
RM780,000RM385.452,024 sqftJun-222 - 2 1/2 sty Terrace
RM770,000RM395.221,948 sqftJun-222 - 2 1/2 sty Terrace
RM700,000RM345.922,024 sqftJun-222 - 2 1/2 sty Terrace
RM1,280,000RM632.532,024 sqftMay-222 - 2 1/2 sty Terrace
RM1,250,000RM542.662,303 sqftMay-222 - 2 1/2 sty Terrace
RM1,020,000RM523.541,948 sqftMay-22Cluster House
RM975,000RM494.981,970 sqftMay-222 - 2 1/2 sty Terrace
RM948,000RM411.552,303 sqftMay-222 - 2 1/2 sty Terrace
RM925,000RM474.781,948 sqftMay-22Cluster House
RM920,000RM399.42,303 sqftMay-222 - 2 1/2 sty Terrace
RM780,000RM385.452,024 sqftMay-222 - 2 1/2 sty Terrace
RM690,000RM403.161,711 sqftMay-222 - 2 1/2 sty Terrace
RM689,000RM270.092,551 sqftMay-222 - 2 1/2 sty Terrace
RM1,000,000RM434.132,303 sqftApr-222 - 2 1/2 sty Terrace
RM950,000RM482.281,970 sqftApr-222 - 2 1/2 sty Terrace
RM800,000RM395.332,024 sqftApr-222 - 2 1/2 sty Terrace
RM758,000RM374.582,024 sqftApr-222 - 2 1/2 sty Terrace
RM750,000RM370.622,024 sqftApr-222 - 2 1/2 sty Terrace
RM740,000RM365.682,024 sqftApr-222 - 2 1/2 sty Terrace
RM728,000RM359.752,024 sqftApr-222 - 2 1/2 sty Terrace
RM725,000RM358.272,024 sqftApr-222 - 2 1/2 sty Terrace
RM670,000RM331.092,024 sqftApr-222 - 2 1/2 sty Terrace
RM645,000RM421.991,528 sqftApr-222 - 2 1/2 sty Terrace
RM1,130,000RM5801,948 sqftMar-22Cluster House
RM1,050,000RM455.832,303 sqftMar-222 - 2 1/2 sty Terrace
RM788,000RM389.42,024 sqftMar-222 - 2 1/2 sty Terrace
RM768,000RM351.482,185 sqftMar-222 - 2 1/2 sty Terrace
RM706,000RM512.421,378 sqftMar-222 - 2 1/2 sty Terrace
RM700,000RM425.051,647 sqftMar-222 - 2 1/2 sty Terrace
RM693,000RM502.981,378 sqftMar-222 - 2 1/2 sty Terrace
RM680,000RM373.811,819 sqftMar-222 - 2 1/2 sty Terrace
RM660,000RM326.152,024 sqftMar-222 - 2 1/2 sty Terrace
RM655,000RM475.41,378 sqftMar-222 - 2 1/2 sty Terrace
RM650,000RM357.321,819 sqftMar-222 - 2 1/2 sty Terrace
RM950,000RM412.422,303 sqftFeb-222 - 2 1/2 sty Terrace
RM820,000RM430.41,905 sqftFeb-222 - 2 1/2 sty Terrace
RM790,000RM390.392,024 sqftFeb-222 - 2 1/2 sty Terrace
RM780,000RM356.972,185 sqftFeb-222 - 2 1/2 sty Terrace
RM720,000RM355.82,024 sqftFeb-222 - 2 1/2 sty Terrace
RM695,000RM306.012,271 sqftFeb-222 - 2 1/2 sty Terrace
RM1,150,000RM499.252,303 sqftJan-222 - 2 1/2 sty Terrace
RM950,000RM498.631,905 sqftJan-222 - 2 1/2 sty Semi-D
RM950,000RM412.422,303 sqftJan-222 - 2 1/2 sty Terrace
RM800,000RM352.242,271 sqftJan-222 - 2 1/2 sty Terrace
RM700,000RM308.212,271 sqftJan-222 - 2 1/2 sty Terrace
RM690,000RM325.42,120 sqftJan-222 - 2 1/2 sty Terrace
RM683,000RM404.161,690 sqftJan-222 - 2 1/2 sty Terrace
RM680,000RM336.032,024 sqftJan-222 - 2 1/2 sty Terrace
2021
RM1,190,000RM600.841,981 sqftDec-212 - 2 1/2 sty Terrace
RM1,160,000RM523.142,217 sqftDec-212 - 2 1/2 sty Terrace
RM1,080,000RM468.862,303 sqftDec-212 - 2 1/2 sty Terrace
RM950,000RM498.631,905 sqftDec-212 - 2 1/2 sty Semi-D
RM912,000RM395.922,303 sqftDec-212 - 2 1/2 sty Terrace
RM800,000RM313.62,551 sqftDec-212 - 2 1/2 sty Terrace
RM765,000RM350.12,185 sqftDec-212 - 2 1/2 sty Terrace
RM745,000RM368.152,024 sqftDec-212 - 2 1/2 sty Terrace
RM726,000RM526.931,378 sqftDec-212 - 2 1/2 sty Terrace
RM720,000RM355.82,024 sqftDec-212 - 2 1/2 sty Terrace
RM718,000RM354.812,024 sqftDec-212 - 2 1/2 sty Terrace
RM675,000RM415.31,625 sqftDec-212 - 2 1/2 sty Terrace
RM630,000RM311.322,024 sqftDec-212 - 2 1/2 sty Terrace
RM1,100,000RM564.61,948 sqftNov-21Cluster House
RM1,000,000RM591.741,690 sqftNov-212 - 2 1/2 sty Terrace
RM950,000RM498.631,905 sqftNov-212 - 2 1/2 sty Semi-D
RM938,000RM466.012,013 sqftNov-212 - 2 1/2 sty Terrace
RM920,000RM482.891,905 sqftNov-212 - 2 1/2 sty Semi-D
RM890,000RM456.821,948 sqftNov-212 - 2 1/2 sty Semi-D
RM800,000RM395.332,024 sqftNov-212 - 2 1/2 sty Terrace
RM770,000RM363.122,121 sqftNov-212 - 2 1/2 sty Terrace
RM730,000RM360.742,024 sqftNov-212 - 2 1/2 sty Terrace
RM685,000RM448.161,528 sqftNov-212 - 2 1/2 sty Terrace
RM675,000RM333.562,024 sqftNov-212 - 2 1/2 sty Terrace
RM1,205,000RM484.622,486 sqftOct-212 - 2 1/2 sty Terrace
RM1,131,000RM561.892,013 sqftOct-212 - 2 1/2 sty Terrace
RM950,000RM412.422,303 sqftOct-212 - 2 1/2 sty Terrace
RM925,000RM485.511,905 sqftOct-212 - 2 1/2 sty Semi-D
RM900,000RM390.712,303 sqftOct-212 - 2 1/2 sty Terrace
RM875,000RM635.081,378 sqftOct-212 - 2 1/2 sty Terrace
RM873,000RM433.712,013 sqftOct-212 - 2 1/2 sty Terrace
RM853,000RM554.171,539 sqftOct-212 - 2 1/2 sty Semi-D
RM840,000RM369.852,271 sqftOct-212 - 2 1/2 sty Terrace
RM815,000RM402.742,024 sqftOct-212 - 2 1/2 sty Terrace
RM740,000RM338.662,185 sqftOct-212 - 2 1/2 sty Terrace
RM700,000RM345.922,024 sqftOct-212 - 2 1/2 sty Terrace
RM670,000RM351.671,905 sqftOct-212 - 2 1/2 sty Terrace
RM665,000RM365.571,819 sqftOct-212 - 2 1/2 sty Terrace
RM900,000RM390.712,303 sqftSep-212 - 2 1/2 sty Terrace
RM883,000RM438.682,013 sqftSep-212 - 2 1/2 sty Terrace
RM863,000RM455.541,894 sqftSep-212 - 2 1/2 sty Semi-D
RM800,000RM412.91,938 sqftSep-212 - 2 1/2 sty Terrace
RM780,000RM385.452,024 sqftSep-212 - 2 1/2 sty Terrace
RM700,000RM345.922,024 sqftSep-212 - 2 1/2 sty Terrace
RM670,000RM331.092,024 sqftSep-212 - 2 1/2 sty Terrace
RM670,000RM331.092,024 sqftSep-212 - 2 1/2 sty Terrace
RM1,070,000RM528.762,024 sqftAug-212 - 2 1/2 sty Terrace
RM980,000RM425.442,303 sqftAug-212 - 2 1/2 sty Terrace
RM750,000RM370.622,024 sqftAug-212 - 2 1/2 sty Terrace
RM1,157,000RM684.641,690 sqftJul-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftJul-212 - 2 1/2 sty Terrace
RM710,000RM350.862,024 sqftJul-212 - 2 1/2 sty Terrace
RM690,000RM461.171,496 sqftJul-212 - 2 1/2 sty Terrace
RM650,000RM321.212,024 sqftJul-212 - 2 1/2 sty Terrace
RM630,000RM311.322,024 sqftJul-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftJun-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftJun-212 - 2 1/2 sty Terrace
RM920,000RM667.741,378 sqftMay-212 - 2 1/2 sty Terrace
RM898,000RM651.771,378 sqftMay-212 - 2 1/2 sty Terrace
RM817,000RM592.981,378 sqftMay-212 - 2 1/2 sty Terrace
RM742,000RM538.551,378 sqftMay-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftMay-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftMay-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftMay-212 - 2 1/2 sty Terrace
RM738,000RM535.641,378 sqftMay-212 - 2 1/2 sty Terrace
RM732,000RM531.291,378 sqftMay-212 - 2 1/2 sty Terrace
RM732,000RM531.291,378 sqftMay-212 - 2 1/2 sty Terrace
RM732,000RM531.291,378 sqftMay-212 - 2 1/2 sty Terrace
RM731,000RM530.561,378 sqftMay-212 - 2 1/2 sty Terrace
RM729,000RM529.111,378 sqftMay-212 - 2 1/2 sty Terrace
RM729,000RM529.111,378 sqftMay-212 - 2 1/2 sty Terrace
RM712,000RM516.771,378 sqftMay-212 - 2 1/2 sty Terrace
RM873,000RM440.781,981 sqftApr-212 - 2 1/2 sty Terrace
RM770,000RM558.871,378 sqftApr-212 - 2 1/2 sty Terrace
RM763,000RM553.791,378 sqftApr-212 - 2 1/2 sty Terrace
RM763,000RM553.791,378 sqftApr-212 - 2 1/2 sty Terrace
RM749,000RM543.631,378 sqftApr-212 - 2 1/2 sty Terrace
RM746,000RM541.451,378 sqftApr-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftApr-212 - 2 1/2 sty Terrace
RM738,000RM535.641,378 sqftApr-212 - 2 1/2 sty Terrace
RM735,000RM533.471,378 sqftApr-212 - 2 1/2 sty Terrace
RM732,000RM531.291,378 sqftApr-212 - 2 1/2 sty Terrace
RM671,000RM487.021,378 sqftApr-212 - 2 1/2 sty Terrace
RM846,000RM614.031,378 sqftMar-212 - 2 1/2 sty Terrace
RM763,000RM553.791,378 sqftMar-212 - 2 1/2 sty Terrace
RM749,000RM543.631,378 sqftMar-212 - 2 1/2 sty Terrace
RM744,000RM5401,378 sqftMar-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftMar-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftMar-212 - 2 1/2 sty Terrace
RM738,000RM535.641,378 sqftMar-212 - 2 1/2 sty Terrace
RM735,000RM533.471,378 sqftMar-212 - 2 1/2 sty Terrace
RM735,000RM533.471,378 sqftMar-212 - 2 1/2 sty Terrace
RM732,000RM531.291,378 sqftMar-212 - 2 1/2 sty Terrace
RM732,000RM531.291,378 sqftMar-212 - 2 1/2 sty Terrace
RM732,000RM531.291,378 sqftMar-212 - 2 1/2 sty Terrace
RM699,000RM507.341,378 sqftMar-212 - 2 1/2 sty Terrace
RM664,000RM481.931,378 sqftMar-212 - 2 1/2 sty Terrace
RM934,000RM677.91,378 sqftFeb-212 - 2 1/2 sty Terrace
RM909,000RM524.531,733 sqftFeb-212 - 2 1/2 sty Terrace
RM909,000RM477.111,905 sqftFeb-212 - 2 1/2 sty Terrace
RM770,000RM558.871,378 sqftFeb-212 - 2 1/2 sty Terrace
RM763,000RM553.791,378 sqftFeb-212 - 2 1/2 sty Terrace
RM763,000RM553.791,378 sqftFeb-212 - 2 1/2 sty Terrace
RM763,000RM553.791,378 sqftFeb-212 - 2 1/2 sty Terrace
RM763,000RM553.791,378 sqftFeb-212 - 2 1/2 sty Terrace
RM763,000RM553.791,378 sqftFeb-212 - 2 1/2 sty Terrace
RM749,000RM543.631,378 sqftFeb-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftFeb-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftFeb-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftFeb-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftFeb-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftFeb-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftFeb-212 - 2 1/2 sty Terrace
RM738,000RM535.641,378 sqftFeb-212 - 2 1/2 sty Terrace
RM735,000RM533.471,378 sqftFeb-212 - 2 1/2 sty Terrace
RM735,000RM533.471,378 sqftFeb-212 - 2 1/2 sty Terrace
RM732,000RM531.291,378 sqftFeb-212 - 2 1/2 sty Terrace
RM707,000RM513.141,378 sqftFeb-212 - 2 1/2 sty Terrace
RM705,000RM511.691,378 sqftFeb-212 - 2 1/2 sty Terrace
RM883,000RM640.891,378 sqftJan-212 - 2 1/2 sty Terrace
RM864,000RM429.242,013 sqftJan-212 - 2 1/2 sty Terrace
RM743,000RM410.881,808 sqftJan-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftJan-212 - 2 1/2 sty Terrace
RM740,000RM537.11,378 sqftJan-212 - 2 1/2 sty Terrace
RM712,000RM516.771,378 sqftJan-212 - 2 1/2 sty Terrace
RM699,000RM507.341,378 sqftJan-212 - 2 1/2 sty Terrace
Recent Highest price Highest PSF

Frequently asked

What is the median price of Taman Rimbayu?

The median registered subsale price at Taman Rimbayu, Kuala Langat is RM763k (median PSF RM473), based on 332 transactions from 2021 to 2026. Source: NAPIC/JPPH.

Are these real sold prices for Taman Rimbayu?

Yes — every row is an actual registered sale recorded by NAPIC/JPPH, not an asking or listing price, showing the floor level, price, price-per-sqft, size and month.