MalaysiaProp
Sign in

Bandar Mahkota Banting (Brooklands)

Kuala Langat, Selangor

Bandar Mahkota Banting (Brooklands) in Kuala Langat, Selangor recorded 411 registered subsale transactions between 2021 and 2026, sized 581–2,896 sqft, with a median price of RM416k and a median PSF of RM296.85. All figures are real registered sales from NAPIC/JPPH — not asking prices.

Transactions

411 subsales
FloorPricePSFSizeDateType
2026
RM419,000RM261.251,604 sqftFeb-262 - 2 1/2 sty Terrace
RM485,000RM333.761,453 sqftJan-262 - 2 1/2 sty Terrace
RM450,000RM464.52969 sqftJan-261 - 1 1/2 sty Terrace
RM419,000RM526.03797 sqftJan-261 - 1 1/2 sty Terrace
RM280,000RM400.2700 sqftJan-261 - 1 1/2 sty Terrace
RM250,000RM252.45990 sqftJan-262 - 2 1/2 sty Terrace
RM250,000RM252.45990 sqftJan-262 - 2 1/2 sty Terrace
RM250,000RM252.45990 sqftJan-262 - 2 1/2 sty Terrace
RM245,000RM247.41990 sqftJan-262 - 2 1/2 sty Terrace
RM245,000RM247.41990 sqftJan-262 - 2 1/2 sty Terrace
RM245,000RM247.41990 sqftJan-262 - 2 1/2 sty Terrace
RM245,000RM247.41990 sqftJan-262 - 2 1/2 sty Terrace
2025
RM437,000RM322.211,356 sqftNov-251 - 1 1/2 sty Terrace
RM300,000RM387.1775 sqftOct-251 - 1 1/2 sty Terrace
RM460,000RM593.55775 sqftAug-251 - 1 1/2 sty Terrace
RM300,000RM387.1775 sqftAug-251 - 1 1/2 sty Terrace
RM400,000RM275.271,453 sqftJul-252 - 2 1/2 sty Terrace
RM370,000RM291.311,270 sqftJul-252 - 2 1/2 sty Terrace
RM500,000RM281.521,776 sqftJun-252 - 2 1/2 sty Terrace
RM563,000RM328.961,711 sqftMay-252 - 2 1/2 sty Terrace
RM500,000RM281.521,776 sqftMay-252 - 2 1/2 sty Terrace
RM360,000RM619.35581 sqftMay-251 - 1 1/2 sty Terrace
RM289,000RM413.06700 sqftMay-251 - 1 1/2 sty Terrace
RM900,000RM472.391,905 sqftApr-25Detached
RM500,000RM281.521,776 sqftApr-252 - 2 1/2 sty Terrace
RM500,000RM281.521,776 sqftMar-252 - 2 1/2 sty Terrace
RM635,000RM371.031,711 sqftFeb-252 - 2 1/2 sty Terrace
RM498,000RM444.861,119 sqftFeb-25Detached
RM398,000RM273.891,453 sqftJan-252 - 2 1/2 sty Terrace
RM310,000RM244.071,270 sqftJan-252 - 2 1/2 sty Terrace
RM250,000RM387.1646 sqftJan-25Low-Cost House
2024
RM610,000RM356.421,711 sqftNov-242 - 2 1/2 sty Terrace
RM500,000RM281.521,776 sqftNov-242 - 2 1/2 sty Terrace
RM400,000RM275.271,453 sqftNov-242 - 2 1/2 sty Terrace
RM580,000RM598.71969 sqftOct-241 - 1 1/2 sty Terrace
RM530,000RM468.941,130 sqftOct-241 - 1 1/2 sty Terrace
RM300,000RM387.1775 sqftOct-241 - 1 1/2 sty Terrace
RM745,000RM414.451,798 sqftSep-24Detached
RM500,000RM339.061,475 sqftSep-242 - 2 1/2 sty Terrace
RM440,000RM439.541,001 sqftSep-241 - 1 1/2 sty Terrace
RM330,000RM567.74581 sqftSep-241 - 1 1/2 sty Terrace
RM300,000RM387.1775 sqftSep-241 - 1 1/2 sty Terrace
RM250,000RM252.45990 sqftSep-242 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftSep-242 - 2 1/2 sty Terrace
RM859,000RM463.981,851 sqftAug-24Detached
RM550,000RM378.491,453 sqftAug-242 - 2 1/2 sty Terrace
RM430,000RM554.84775 sqftAug-241 - 1 1/2 sty Terrace
RM420,000RM443.4947 sqftAug-241 - 1 1/2 sty Terrace
RM400,000RM403.93990 sqftAug-242 - 2 1/2 sty Terrace
RM340,000RM438.71775 sqftAug-241 - 1 1/2 sty Terrace
RM317,000RM409.03775 sqftAug-241 - 1 1/2 sty Terrace
RM250,000RM252.45990 sqftAug-242 - 2 1/2 sty Terrace
RM395,000RM271.831,453 sqftJul-242 - 2 1/2 sty Terrace
RM320,000RM530.88603 sqftJul-241 - 1 1/2 sty Terrace
RM300,000RM497.7603 sqftJul-241 - 1 1/2 sty Terrace
RM280,000RM481.72581 sqftJul-241 - 1 1/2 sty Terrace
RM250,000RM430.11581 sqftJul-241 - 1 1/2 sty Terrace
RM250,000RM252.45990 sqftJul-242 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftJul-242 - 2 1/2 sty Terrace
RM250,000RM195.171,281 sqftJul-242 - 2 1/2 sty Terrace
RM500,000RM344.091,453 sqftJun-242 - 2 1/2 sty Terrace
RM400,000RM275.271,453 sqftJun-242 - 2 1/2 sty Terrace
RM250,000RM252.45990 sqftJun-242 - 2 1/2 sty Terrace
RM250,000RM252.45990 sqftJun-242 - 2 1/2 sty Terrace
RM245,000RM247.41990 sqftJun-242 - 2 1/2 sty Terrace
RM430,000RM338.551,270 sqftMay-242 - 2 1/2 sty Terrace
RM370,000RM477.42775 sqftMay-241 - 1 1/2 sty Terrace
RM350,000RM451.61775 sqftMay-241 - 1 1/2 sty Terrace
RM350,000RM353.44990 sqftMay-242 - 2 1/2 sty Terrace
RM475,000RM267.451,776 sqftApr-242 - 2 1/2 sty Terrace
RM450,000RM309.681,453 sqftApr-242 - 2 1/2 sty Terrace
RM420,000RM309.681,356 sqftApr-242 - 2 1/2 sty Terrace
RM315,000RM318.09990 sqftApr-242 - 2 1/2 sty Terrace
RM290,000RM292.85990 sqftApr-242 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftApr-242 - 2 1/2 sty Terrace
RM250,000RM195.171,281 sqftApr-242 - 2 1/2 sty Terrace
RM679,000RM426.221,593 sqftMar-242 - 2 1/2 sty Terrace
RM535,000RM301.231,776 sqftMar-242 - 2 1/2 sty Terrace
RM505,000RM342.451,475 sqftMar-242 - 2 1/2 sty Terrace
RM500,000RM172.682,896 sqftMar-242 - 2 1/2 sty Terrace
RM468,000RM293.771,593 sqftMar-242 - 2 1/2 sty Terrace
RM440,000RM444.32990 sqftMar-241 - 1 1/2 sty Terrace
RM250,000RM252.45990 sqftMar-241 - 1 1/2 sty Terrace
RM250,000RM225.491,109 sqftMar-242 - 2 1/2 sty Terrace
RM515,000RM349.231,475 sqftFeb-242 - 2 1/2 sty Terrace
RM505,000RM347.531,453 sqftFeb-242 - 2 1/2 sty Terrace
RM500,000RM504.91990 sqftFeb-241 - 1 1/2 sty Terrace
RM500,000RM339.061,475 sqftFeb-242 - 2 1/2 sty Terrace
RM500,000RM339.061,475 sqftFeb-242 - 2 1/2 sty Terrace
RM500,000RM339.061,475 sqftFeb-242 - 2 1/2 sty Terrace
RM475,000RM302.251,572 sqftFeb-241 - 1 1/2 sty Terrace
RM350,000RM353.44990 sqftFeb-242 - 2 1/2 sty Terrace
RM320,000RM412.9775 sqftFeb-241 - 1 1/2 sty Terrace
RM700,000RM445.431,572 sqftJan-242 - 2 1/2 sty Terrace
RM552,000RM374.331,475 sqftJan-242 - 2 1/2 sty Terrace
RM515,000RM349.231,475 sqftJan-242 - 2 1/2 sty Terrace
RM505,000RM342.451,475 sqftJan-242 - 2 1/2 sty Terrace
RM500,000RM339.061,475 sqftJan-242 - 2 1/2 sty Terrace
RM468,000RM359.331,302 sqftJan-242 - 2 1/2 sty Terrace
RM468,000RM317.361,475 sqftJan-242 - 2 1/2 sty Terrace
RM468,000RM293.771,593 sqftJan-242 - 2 1/2 sty Terrace
RM400,000RM399.581,001 sqftJan-241 - 1 1/2 sty Terrace
RM330,000RM333.24990 sqftJan-242 - 2 1/2 sty Terrace
RM320,000RM323.14990 sqftJan-242 - 2 1/2 sty Terrace
RM286,000RM181.991,572 sqftJan-241 - 1 1/2 sty Terrace
RM250,000RM159.081,572 sqftJan-241 - 1 1/2 sty Terrace
RM250,000RM159.081,572 sqftJan-241 - 1 1/2 sty Terrace
RM250,000RM160.181,561 sqftJan-242 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftJan-242 - 2 1/2 sty Terrace
RM245,000RM421.5581 sqftJan-241 - 1 1/2 sty Terrace
2023
RM505,000RM744.7678 sqftDec-232 - 2 1/2 sty Terrace
RM396,000RM222.971,776 sqftDec-232 - 2 1/2 sty Terrace
RM350,000RM451.61775 sqftDec-231 - 1 1/2 sty Terrace
RM290,000RM374.19775 sqftDec-231 - 1 1/2 sty Terrace
RM710,000RM366.451,938 sqftNov-23Detached
RM552,000RM190.642,896 sqftNov-232 - 2 1/2 sty Terrace
RM505,000RM342.451,475 sqftNov-232 - 2 1/2 sty Terrace
RM505,000RM342.451,475 sqftNov-232 - 2 1/2 sty Terrace
RM500,000RM645.16775 sqftNov-232 - 2 1/2 sty Terrace
RM500,000RM172.682,896 sqftNov-232 - 2 1/2 sty Terrace
RM475,000RM267.451,776 sqftNov-232 - 2 1/2 sty Terrace
RM471,000RM236.531,991 sqftNov-232 - 2 1/2 sty Terrace
RM470,000RM255.351,841 sqftNov-232 - 2 1/2 sty Terrace
RM431,000RM256.671,679 sqftNov-232 - 2 1/2 sty Terrace
RM430,000RM429.551,001 sqftNov-231 - 1 1/2 sty Terrace
RM345,000RM194.251,776 sqftNov-231 - 1 1/2 sty Terrace
RM298,000RM189.621,572 sqftNov-231 - 1 1/2 sty Terrace
RM288,000RM183.261,572 sqftNov-232 - 2 1/2 sty Terrace
RM288,000RM183.261,572 sqftNov-232 - 2 1/2 sty Terrace
RM273,000RM275.68990 sqftNov-232 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftNov-231 - 1 1/2 sty Terrace
RM250,000RM181.451,378 sqftNov-232 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftNov-232 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftNov-232 - 2 1/2 sty Terrace
RM505,000RM174.412,895 sqftOct-232 - 2 1/2 sty Terrace
RM505,000RM342.451,475 sqftOct-232 - 2 1/2 sty Terrace
RM505,000RM744.7678 sqftOct-232 - 2 1/2 sty Terrace
RM500,000RM172.682,896 sqftOct-232 - 2 1/2 sty Terrace
RM500,000RM172.682,896 sqftOct-232 - 2 1/2 sty Terrace
RM500,000RM172.682,896 sqftOct-232 - 2 1/2 sty Terrace
RM500,000RM737.33678 sqftOct-232 - 2 1/2 sty Terrace
RM500,000RM172.682,896 sqftOct-232 - 2 1/2 sty Terrace
RM451,000RM332.531,356 sqftOct-232 - 2 1/2 sty Terrace
RM440,000RM454.19969 sqftOct-231 - 1 1/2 sty Terrace
RM440,000RM319.351,378 sqftOct-232 - 2 1/2 sty Terrace
RM406,000RM215.541,884 sqftOct-232 - 2 1/2 sty Terrace
RM396,000RM222.971,776 sqftOct-232 - 2 1/2 sty Terrace
RM350,000RM353.44990 sqftOct-231 - 1 1/2 sty Terrace
RM330,000RM425.81775 sqftOct-231 - 1 1/2 sty Terrace
RM330,000RM333.24990 sqftOct-232 - 2 1/2 sty Terrace
RM288,000RM183.261,572 sqftOct-232 - 2 1/2 sty Terrace
RM250,000RM225.491,109 sqftOct-231 - 1 1/2 sty Terrace
RM250,000RM159.081,572 sqftOct-232 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftOct-232 - 2 1/2 sty Terrace
RM924,000RM319.122,895 sqftSep-232 - 2 1/2 sty Terrace
RM739,000RM255.222,896 sqftSep-232 - 2 1/2 sty Terrace
RM680,000RM461.131,475 sqftSep-232 - 2 1/2 sty Terrace
RM668,000RM230.72,896 sqftSep-232 - 2 1/2 sty Terrace
RM641,000RM221.382,895 sqftSep-232 - 2 1/2 sty Terrace
RM583,000RM859.72678 sqftSep-232 - 2 1/2 sty Terrace
RM571,000RM197.22,896 sqftSep-232 - 2 1/2 sty Terrace
RM505,000RM174.412,895 sqftSep-232 - 2 1/2 sty Terrace
RM505,000RM342.451,475 sqftSep-232 - 2 1/2 sty Terrace
RM505,000RM342.451,475 sqftSep-232 - 2 1/2 sty Terrace
RM500,000RM172.682,896 sqftSep-232 - 2 1/2 sty Terrace
RM500,000RM172.682,896 sqftSep-232 - 2 1/2 sty Terrace
RM500,000RM339.061,475 sqftSep-232 - 2 1/2 sty Terrace
RM500,000RM172.682,896 sqftSep-232 - 2 1/2 sty Terrace
RM454,000RM329.521,378 sqftSep-232 - 2 1/2 sty Terrace
RM454,000RM329.521,378 sqftSep-232 - 2 1/2 sty Terrace
RM454,000RM156.82,895 sqftSep-232 - 2 1/2 sty Terrace
RM400,000RM516.13775 sqftSep-231 - 1 1/2 sty Terrace
RM350,000RM353.44990 sqftSep-232 - 2 1/2 sty Terrace
RM330,000RM259.811,270 sqftSep-231 - 1 1/2 sty Terrace
RM326,000RM207.441,572 sqftSep-232 - 2 1/2 sty Terrace
RM310,000RM533.33581 sqftSep-231 - 1 1/2 sty Terrace
RM288,000RM259.771,109 sqftSep-232 - 2 1/2 sty Terrace
RM250,000RM225.491,109 sqftSep-232 - 2 1/2 sty Terrace
RM250,000RM181.451,378 sqftSep-232 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftSep-232 - 2 1/2 sty Terrace
RM250,000RM225.491,109 sqftSep-232 - 2 1/2 sty Terrace
RM250,000RM160.181,561 sqftSep-232 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftSep-232 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftSep-232 - 2 1/2 sty Terrace
RM250,000RM225.491,109 sqftSep-232 - 2 1/2 sty Terrace
RM475,000RM267.451,776 sqftAug-232 - 2 1/2 sty Terrace
RM475,000RM267.451,776 sqftAug-232 - 2 1/2 sty Terrace
RM475,000RM267.451,776 sqftAug-232 - 2 1/2 sty Terrace
RM298,000RM268.791,109 sqftAug-232 - 2 1/2 sty Terrace
RM298,000RM216.291,378 sqftAug-232 - 2 1/2 sty Terrace
RM273,000RM213.131,281 sqftAug-232 - 2 1/2 sty Terrace
RM250,000RM159.081,572 sqftAug-232 - 2 1/2 sty Terrace
RM239,000RM336.42710 sqftAug-23Low-Cost House
RM500,000RM344.091,453 sqftJul-232 - 2 1/2 sty Terrace
RM475,000RM267.451,776 sqftJul-232 - 2 1/2 sty Terrace
RM475,000RM267.451,776 sqftJul-232 - 2 1/2 sty Terrace
RM300,000RM516.13581 sqftJul-231 - 1 1/2 sty Terrace
RM200,000RM344.09581 sqftJul-231 - 1 1/2 sty Terrace
RM475,000RM267.451,776 sqftJun-232 - 2 1/2 sty Terrace
RM430,000RM429.551,001 sqftJun-231 - 1 1/2 sty Terrace
RM330,000RM425.81775 sqftJun-231 - 1 1/2 sty Terrace
RM310,000RM400775 sqftJun-231 - 1 1/2 sty Terrace
RM300,000RM387.1775 sqftJun-231 - 1 1/2 sty Terrace
RM270,000RM464.52581 sqftJun-231 - 1 1/2 sty Terrace
RM535,000RM301.231,776 sqftMay-232 - 2 1/2 sty Terrace
RM475,000RM267.451,776 sqftMay-232 - 2 1/2 sty Terrace
RM416,000RM304.311,367 sqftMay-232 - 2 1/2 sty Terrace
RM409,000RM296.851,378 sqftMay-232 - 2 1/2 sty Terrace
RM355,000RM458.06775 sqftMay-231 - 1 1/2 sty Terrace
RM345,000RM194.251,776 sqftMay-231 - 1 1/2 sty Terrace
RM300,000RM497.7603 sqftMay-231 - 1 1/2 sty Terrace
RM285,000RM287.8990 sqftMay-232 - 2 1/2 sty Terrace
RM475,000RM267.451,776 sqftApr-232 - 2 1/2 sty Terrace
RM301,000RM207.141,453 sqftApr-232 - 2 1/2 sty Terrace
RM475,000RM267.451,776 sqftMar-232 - 2 1/2 sty Terrace
RM475,000RM267.451,776 sqftMar-232 - 2 1/2 sty Terrace
RM440,000RM302.81,453 sqftMar-232 - 2 1/2 sty Terrace
RM350,000RM353.44990 sqftMar-232 - 2 1/2 sty Terrace
RM345,000RM194.251,776 sqftMar-232 - 2 1/2 sty Terrace
RM255,000RM364.47700 sqftMar-231 - 1 1/2 sty Terrace
RM475,000RM267.451,776 sqftFeb-232 - 2 1/2 sty Terrace
RM442,000RM245.891,798 sqftFeb-232 - 2 1/2 sty Terrace
RM438,000RM246.621,776 sqftFeb-232 - 2 1/2 sty Terrace
RM419,000RM338.491,238 sqftFeb-232 - 2 1/2 sty Terrace
RM345,000RM194.251,776 sqftFeb-232 - 2 1/2 sty Terrace
RM345,000RM194.251,776 sqftFeb-232 - 2 1/2 sty Terrace
RM294,000RM231.471,270 sqftFeb-232 - 2 1/2 sty Terrace
RM745,000RM395.51,884 sqftJan-23Detached
RM535,000RM301.231,776 sqftJan-232 - 2 1/2 sty Terrace
RM450,000RM580.64775 sqftJan-231 - 1 1/2 sty Terrace
RM285,000RM367.74775 sqftJan-231 - 1 1/2 sty Terrace
2022
RM478,000RM346.941,378 sqftDec-222 - 2 1/2 sty Terrace
RM475,000RM296.171,604 sqftDec-222 - 2 1/2 sty Terrace
RM415,000RM414.571,001 sqftDec-221 - 1 1/2 sty Terrace
RM408,000RM280.771,453 sqftDec-222 - 2 1/2 sty Terrace
RM376,000RM258.751,453 sqftDec-222 - 2 1/2 sty Terrace
RM368,000RM289.731,270 sqftDec-222 - 2 1/2 sty Terrace
RM745,000RM372.112,002 sqftNov-22Detached
RM493,000RM275.911,787 sqftNov-222 - 2 1/2 sty Terrace
RM465,000RM276.921,679 sqftNov-222 - 2 1/2 sty Terrace
RM410,000RM529.03775 sqftNov-221 - 1 1/2 sty Terrace
RM390,000RM268.391,453 sqftNov-222 - 2 1/2 sty Terrace
RM380,000RM379.61,001 sqftNov-221 - 1 1/2 sty Terrace
RM345,000RM194.251,776 sqftNov-222 - 2 1/2 sty Terrace
RM345,000RM278.711,238 sqftNov-222 - 2 1/2 sty Terrace
RM345,000RM194.251,776 sqftOct-222 - 2 1/2 sty Terrace
RM300,000RM302.94990 sqftOct-221 - 1 1/2 sty Terrace
RM300,000RM387.1775 sqftOct-221 - 1 1/2 sty Terrace
RM285,000RM490.32581 sqftOct-221 - 1 1/2 sty Terrace
RM260,000RM447.31581 sqftOct-221 - 1 1/2 sty Terrace
RM520,000RM357.851,453 sqftSep-222 - 2 1/2 sty Terrace
RM439,000RM302.111,453 sqftSep-222 - 2 1/2 sty Terrace
RM400,000RM275.271,453 sqftSep-222 - 2 1/2 sty Terrace
RM384,000RM264.261,453 sqftSep-222 - 2 1/2 sty Terrace
RM331,000RM186.371,776 sqftSep-222 - 2 1/2 sty Terrace
RM280,000RM361.29775 sqftSep-221 - 1 1/2 sty Terrace
RM270,000RM272.65990 sqftSep-222 - 2 1/2 sty Terrace
RM250,000RM430.11581 sqftSep-221 - 1 1/2 sty Terrace
RM500,000RM354.591,410 sqftAug-222 - 2 1/2 sty Terrace
RM458,000RM332.421,378 sqftAug-222 - 2 1/2 sty Terrace
RM447,000RM324.441,378 sqftAug-222 - 2 1/2 sty Terrace
RM444,000RM264.421,679 sqftAug-222 - 2 1/2 sty Terrace
RM416,000RM301.941,378 sqftAug-222 - 2 1/2 sty Terrace
RM412,000RM299.031,378 sqftAug-222 - 2 1/2 sty Terrace
RM345,000RM194.251,776 sqftAug-222 - 2 1/2 sty Terrace
RM300,000RM387.1775 sqftAug-221 - 1 1/2 sty Terrace
RM290,000RM481.11603 sqftAug-221 - 1 1/2 sty Terrace
RM265,000RM439.63603 sqftAug-221 - 1 1/2 sty Terrace
RM260,000RM335.48775 sqftAug-221 - 1 1/2 sty Terrace
RM478,000RM267.521,787 sqftJul-222 - 2 1/2 sty Terrace
RM458,000RM253.271,808 sqftJul-222 - 2 1/2 sty Terrace
RM453,000RM321.261,410 sqftJul-222 - 2 1/2 sty Terrace
RM447,000RM264.511,690 sqftJul-222 - 2 1/2 sty Terrace
RM447,000RM241.441,851 sqftJul-222 - 2 1/2 sty Terrace
RM447,000RM224.471,991 sqftJul-222 - 2 1/2 sty Terrace
RM446,000RM394.621,130 sqftJul-221 - 1 1/2 sty Terrace
RM416,000RM301.941,378 sqftJul-222 - 2 1/2 sty Terrace
RM350,000RM361.29969 sqftJul-221 - 1 1/2 sty Terrace
RM300,000RM302.94990 sqftJul-222 - 2 1/2 sty Terrace
RM290,000RM498.92581 sqftJul-221 - 1 1/2 sty Terrace
RM280,000RM481.72581 sqftJul-221 - 1 1/2 sty Terrace
RM536,000RM380.121,410 sqftJun-222 - 2 1/2 sty Terrace
RM510,000RM350.971,453 sqftJun-222 - 2 1/2 sty Terrace
RM448,000RM317.711,410 sqftJun-222 - 2 1/2 sty Terrace
RM442,000RM283.191,561 sqftJun-222 - 2 1/2 sty Terrace
RM416,000RM301.941,378 sqftJun-222 - 2 1/2 sty Terrace
RM416,000RM301.941,378 sqftJun-222 - 2 1/2 sty Terrace
RM407,000RM288.641,410 sqftJun-222 - 2 1/2 sty Terrace
RM395,000RM271.831,453 sqftJun-222 - 2 1/2 sty Terrace
RM350,000RM309.681,130 sqftJun-222 - 2 1/2 sty Terrace
RM330,000RM329.661,001 sqftJun-221 - 1 1/2 sty Terrace
RM310,000RM313.04990 sqftJun-222 - 2 1/2 sty Terrace
RM412,000RM296.711,389 sqftMay-222 - 2 1/2 sty Terrace
RM294,000RM246.071,195 sqftMay-222 - 2 1/2 sty Terrace
RM570,000RM575.6990 sqftApr-222 - 2 1/2 sty Terrace
RM495,000RM522.58947 sqftApr-221 - 1 1/2 sty Terrace
RM478,000RM346.941,378 sqftApr-222 - 2 1/2 sty Terrace
RM447,000RM326.991,367 sqftApr-222 - 2 1/2 sty Terrace
RM444,000RM322.261,378 sqftApr-222 - 2 1/2 sty Terrace
RM409,000RM296.851,378 sqftApr-222 - 2 1/2 sty Terrace
RM390,000RM503.23775 sqftApr-221 - 1 1/2 sty Terrace
RM350,000RM361.29969 sqftApr-221 - 1 1/2 sty Terrace
RM280,000RM282.75990 sqftApr-222 - 2 1/2 sty Terrace
RM250,000RM322.58775 sqftApr-221 - 1 1/2 sty Terrace
RM755,000RM441.141,711 sqftMar-222 - 2 1/2 sty Terrace
RM471,000RM263.61,787 sqftMar-222 - 2 1/2 sty Terrace
RM471,000RM341.851,378 sqftMar-222 - 2 1/2 sty Terrace
RM447,000RM324.441,378 sqftMar-222 - 2 1/2 sty Terrace
RM447,000RM250.171,787 sqftMar-222 - 2 1/2 sty Terrace
RM444,000RM245.531,808 sqftMar-222 - 2 1/2 sty Terrace
RM444,000RM222.971,991 sqftMar-222 - 2 1/2 sty Terrace
RM440,000RM246.251,787 sqftMar-222 - 2 1/2 sty Terrace
RM438,000RM245.131,787 sqftMar-222 - 2 1/2 sty Terrace
RM330,000RM333.24990 sqftMar-222 - 2 1/2 sty Terrace
RM300,000RM387.1775 sqftMar-221 - 1 1/2 sty Terrace
RM296,000RM381.94775 sqftMar-221 - 1 1/2 sty Terrace
RM230,000RM395.7581 sqftMar-221 - 1 1/2 sty Terrace
RM447,000RM223.272,002 sqftFeb-222 - 2 1/2 sty Terrace
RM444,000RM324.81,367 sqftFeb-222 - 2 1/2 sty Terrace
RM440,000RM319.351,378 sqftFeb-222 - 2 1/2 sty Terrace
RM440,000RM232.261,894 sqftFeb-222 - 2 1/2 sty Terrace
RM435,000RM278.711,561 sqftFeb-222 - 2 1/2 sty Terrace
RM409,000RM205.391,991 sqftFeb-222 - 2 1/2 sty Terrace
RM299,000RM213.681,399 sqftFeb-222 - 2 1/2 sty Terrace
RM294,000RM246.071,195 sqftFeb-222 - 2 1/2 sty Terrace
RM294,000RM231.471,270 sqftFeb-222 - 2 1/2 sty Terrace
RM294,000RM246.071,195 sqftFeb-222 - 2 1/2 sty Terrace
RM280,000RM481.72581 sqftFeb-221 - 1 1/2 sty Terrace
RM210,000RM300.15700 sqftFeb-221 - 1 1/2 sty Terrace
RM400,000RM275.271,453 sqftJan-222 - 2 1/2 sty Terrace
RM294,000RM246.071,195 sqftJan-222 - 2 1/2 sty Terrace
2021
RM745,000RM395.51,884 sqftDec-21Detached
RM538,000RM390.481,378 sqftDec-212 - 2 1/2 sty Terrace
RM538,000RM301.11,787 sqftDec-212 - 2 1/2 sty Terrace
RM514,000RM259.521,981 sqftDec-212 - 2 1/2 sty Terrace
RM500,000RM344.091,453 sqftDec-212 - 2 1/2 sty Terrace
RM486,000RM352.741,378 sqftDec-212 - 2 1/2 sty Terrace
RM471,000RM344.551,367 sqftDec-212 - 2 1/2 sty Terrace
RM471,000RM341.851,378 sqftDec-212 - 2 1/2 sty Terrace
RM471,000RM263.61,787 sqftDec-212 - 2 1/2 sty Terrace
RM471,000RM236.531,991 sqftDec-212 - 2 1/2 sty Terrace
RM471,000RM235.252,002 sqftDec-212 - 2 1/2 sty Terrace
RM471,000RM341.851,378 sqftDec-212 - 2 1/2 sty Terrace
RM471,000RM263.61,787 sqftDec-212 - 2 1/2 sty Terrace
RM471,000RM236.531,991 sqftDec-212 - 2 1/2 sty Terrace
RM440,000RM319.351,378 sqftDec-212 - 2 1/2 sty Terrace
RM440,000RM216.282,034 sqftDec-212 - 2 1/2 sty Terrace
RM440,000RM321.871,367 sqftDec-212 - 2 1/2 sty Terrace
RM440,000RM319.351,378 sqftDec-212 - 2 1/2 sty Terrace
RM440,000RM243.321,808 sqftDec-212 - 2 1/2 sty Terrace
RM440,000RM321.871,367 sqftDec-212 - 2 1/2 sty Terrace
RM440,000RM246.251,787 sqftDec-212 - 2 1/2 sty Terrace
RM439,000RM302.111,453 sqftDec-212 - 2 1/2 sty Terrace
RM438,000RM320.411,367 sqftDec-212 - 2 1/2 sty Terrace
RM438,000RM317.91,378 sqftDec-212 - 2 1/2 sty Terrace
RM438,000RM245.131,787 sqftDec-212 - 2 1/2 sty Terrace
RM438,000RM219.951,991 sqftDec-212 - 2 1/2 sty Terrace
RM435,000RM278.711,561 sqftDec-212 - 2 1/2 sty Terrace
RM430,000RM295.911,453 sqftDec-212 - 2 1/2 sty Terrace
RM423,000RM307.021,378 sqftDec-212 - 2 1/2 sty Terrace
RM423,000RM251.911,679 sqftDec-212 - 2 1/2 sty Terrace
RM423,000RM307.021,378 sqftDec-212 - 2 1/2 sty Terrace
RM410,000RM217.661,884 sqftDec-212 - 2 1/2 sty Terrace
RM409,000RM279.391,464 sqftDec-212 - 2 1/2 sty Terrace
RM409,000RM262.051,561 sqftDec-212 - 2 1/2 sty Terrace
RM409,000RM262.051,561 sqftDec-212 - 2 1/2 sty Terrace
RM409,000RM228.91,787 sqftDec-212 - 2 1/2 sty Terrace
RM409,000RM296.851,378 sqftDec-212 - 2 1/2 sty Terrace
RM409,000RM228.91,787 sqftDec-212 - 2 1/2 sty Terrace
RM409,000RM296.851,378 sqftDec-212 - 2 1/2 sty Terrace
RM409,000RM242.021,690 sqftDec-212 - 2 1/2 sty Terrace
RM409,000RM299.191,367 sqftDec-212 - 2 1/2 sty Terrace
RM405,000RM293.951,378 sqftDec-212 - 2 1/2 sty Terrace
RM360,000RM359.631,001 sqftDec-211 - 1 1/2 sty Terrace
RM350,000RM309.681,130 sqftDec-211 - 1 1/2 sty Terrace
RM294,000RM231.471,270 sqftDec-212 - 2 1/2 sty Terrace
RM250,000RM414.75603 sqftDec-211 - 1 1/2 sty Terrace
RM548,000RM275.191,991 sqftNov-212 - 2 1/2 sty Terrace
RM516,000RM374.521,378 sqftNov-212 - 2 1/2 sty Terrace
RM506,000RM254.11,991 sqftNov-212 - 2 1/2 sty Terrace
RM486,000RM244.061,991 sqftNov-212 - 2 1/2 sty Terrace
RM471,000RM236.531,991 sqftNov-212 - 2 1/2 sty Terrace
RM471,000RM341.851,378 sqftNov-212 - 2 1/2 sty Terrace
RM471,000RM260.461,808 sqftNov-212 - 2 1/2 sty Terrace
RM455,000RM228.491,991 sqftNov-212 - 2 1/2 sty Terrace
RM451,000RM288.961,561 sqftNov-212 - 2 1/2 sty Terrace
RM440,000RM239.051,841 sqftNov-212 - 2 1/2 sty Terrace
RM440,000RM220.961,991 sqftNov-212 - 2 1/2 sty Terrace
RM440,000RM319.351,378 sqftNov-212 - 2 1/2 sty Terrace
RM440,000RM220.961,991 sqftNov-212 - 2 1/2 sty Terrace
RM438,000RM320.411,367 sqftNov-212 - 2 1/2 sty Terrace
RM438,000RM245.131,787 sqftNov-212 - 2 1/2 sty Terrace
RM438,000RM320.411,367 sqftNov-212 - 2 1/2 sty Terrace
RM409,000RM296.851,378 sqftNov-212 - 2 1/2 sty Terrace
RM409,000RM205.391,991 sqftNov-212 - 2 1/2 sty Terrace
RM294,000RM246.071,195 sqftNov-212 - 2 1/2 sty Terrace
RM522,000RM359.231,453 sqftOct-212 - 2 1/2 sty Terrace
RM485,000RM333.761,453 sqftOct-212 - 2 1/2 sty Terrace
RM300,000RM387.1775 sqftOct-211 - 1 1/2 sty Terrace
RM240,000RM412.9581 sqftOct-211 - 1 1/2 sty Terrace
RM356,000RM170.482,088 sqftSep-212 - 2 1/2 sty Terrace
RM338,000RM282.891,195 sqftSep-212 - 2 1/2 sty Terrace
RM439,000RM302.111,453 sqftAug-212 - 2 1/2 sty Terrace
RM356,000RM280.281,270 sqftAug-212 - 2 1/2 sty Terrace
RM320,000RM412.9775 sqftAug-211 - 1 1/2 sty Terrace
RM300,000RM302.94990 sqftJul-212 - 2 1/2 sty Terrace
RM269,000RM271.64990 sqftJun-212 - 2 1/2 sty Terrace
RM294,000RM231.471,270 sqftMay-212 - 2 1/2 sty Terrace
RM294,000RM246.071,195 sqftMay-212 - 2 1/2 sty Terrace
RM299,000RM213.681,399 sqftApr-212 - 2 1/2 sty Terrace
RM444,000RM248.491,787 sqftMar-212 - 2 1/2 sty Terrace
Recent Highest price Highest PSF

Frequently asked

What is the median price of Bandar Mahkota Banting (Brooklands)?

The median registered subsale price at Bandar Mahkota Banting (Brooklands), Kuala Langat is RM416k (median PSF RM296.85), based on 411 transactions from 2021 to 2026. Source: NAPIC/JPPH.

Are these real sold prices for Bandar Mahkota Banting (Brooklands)?

Yes — every row is an actual registered sale recorded by NAPIC/JPPH, not an asking or listing price, showing the floor level, price, price-per-sqft, size and month.