MalaysiaProp
Sign in

Alam Sari Bangi

Hulu Langat, Selangor

Alam Sari Bangi in Hulu Langat, Selangor recorded 253 registered subsale transactions between 2021 and 2025, sized 1,302–10,215 sqft, with a median price of RM833k and a median PSF of RM416. All figures are real registered sales from NAPIC/JPPH — not asking prices.

Transactions

253 subsales
FloorPricePSFSizeDateType
2025
RM650,000RM384.631,690 sqftMay-252 - 2 1/2 sty Terrace
RM630,000RM372.81,690 sqftMar-252 - 2 1/2 sty Terrace
2024
RM640,000RM330.321,938 sqftOct-242 - 2 1/2 sty Terrace
RM720,000RM359.632,002 sqftSep-242 - 2 1/2 sty Terrace
RM679,000RM521.331,302 sqftSep-242 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftSep-242 - 2 1/2 sty Terrace
RM625,000RM369.841,690 sqftSep-242 - 2 1/2 sty Terrace
RM1,804,000RM448.124,026 sqftAug-242 - 2 1/2 sty Semi-D
RM864,000RM415.92,077 sqftAug-24Cluster House
RM679,000RM521.331,302 sqftAug-242 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftAug-242 - 2 1/2 sty Terrace
RM1,805,000RM447.174,036 sqftJul-242 - 2 1/2 sty Semi-D
RM954,000RM459.222,077 sqftJul-24Cluster House
RM864,000RM415.92,077 sqftJul-24Cluster House
RM700,000RM414.221,690 sqftJul-242 - 2 1/2 sty Terrace
RM679,000RM521.331,302 sqftJul-242 - 2 1/2 sty Terrace
RM2,937,000RM839.563,498 sqftJun-24Detached
RM1,861,000RM708.582,626 sqftJun-242 - 2 1/2 sty Semi-D
RM952,000RM373.182,551 sqftJun-242 - 2 1/2 sty Terrace
RM866,000RM416.862,077 sqftJun-24Cluster House
RM864,000RM415.92,077 sqftJun-24Cluster House
RM864,000RM415.92,077 sqftJun-24Cluster House
RM750,000RM374.612,002 sqftJun-242 - 2 1/2 sty Terrace
RM679,000RM521.331,302 sqftJun-242 - 2 1/2 sty Terrace
RM2,846,000RM318.948,923 sqftMay-24Detached
RM2,635,000RM399.356,598 sqftMay-24Detached
RM864,000RM415.92,077 sqftMay-24Cluster House
RM850,000RM506.21,679 sqftMay-242 - 2 1/2 sty Terrace
RM699,000RM536.691,302 sqftMay-242 - 2 1/2 sty Terrace
RM1,681,000RM430.223,907 sqftApr-242 - 2 1/2 sty Semi-D
RM910,000RM353.732,573 sqftApr-24Cluster House
RM757,000RM355.192,131 sqftApr-242 - 2 1/2 sty Terrace
RM640,000RM300.292,131 sqftApr-242 - 2 1/2 sty Terrace
RM610,000RM360.961,690 sqftApr-242 - 2 1/2 sty Terrace
RM2,605,000RM744.653,498 sqftMar-24Detached
RM880,000RM446.751,970 sqftMar-242 - 2 1/2 sty Terrace
RM864,000RM415.92,077 sqftMar-24Cluster House
RM702,000RM538.991,302 sqftMar-242 - 2 1/2 sty Terrace
RM699,000RM536.691,302 sqftMar-242 - 2 1/2 sty Terrace
RM1,679,000RM429.713,907 sqftFeb-242 - 2 1/2 sty Semi-D
RM1,330,000RM523.562,540 sqftFeb-242 - 2 1/2 sty Semi-D
RM866,000RM416.862,077 sqftFeb-24Cluster House
RM860,000RM344.382,497 sqftFeb-242 - 2 1/2 sty Terrace
RM730,000RM434.741,679 sqftFeb-242 - 2 1/2 sty Terrace
RM956,000RM460.182,077 sqftJan-24Cluster House
RM864,000RM415.92,077 sqftJan-24Cluster House
RM850,000RM431.521,970 sqftJan-242 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftJan-242 - 2 1/2 sty Terrace
2023
RM1,759,000RM450.183,907 sqftDec-232 - 2 1/2 sty Semi-D
RM1,320,000RM459.32,874 sqftDec-232 - 2 1/2 sty Semi-D
RM833,000RM400.982,077 sqftDec-23Cluster House
RM821,000RM395.22,077 sqftDec-23Cluster House
RM702,000RM350.632,002 sqftDec-232 - 2 1/2 sty Terrace
RM702,000RM538.991,302 sqftDec-232 - 2 1/2 sty Terrace
RM699,000RM536.691,302 sqftDec-232 - 2 1/2 sty Terrace
RM697,000RM535.151,302 sqftDec-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftDec-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftDec-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftDec-232 - 2 1/2 sty Terrace
RM2,650,000RM837.393,165 sqftNov-23Detached
RM2,569,000RM428.495,995 sqftNov-23Detached
RM1,325,000RM515.052,573 sqftNov-23Cluster House
RM833,000RM400.982,077 sqftNov-23Cluster House
RM699,000RM536.691,302 sqftNov-232 - 2 1/2 sty Terrace
RM672,000RM515.961,302 sqftNov-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftNov-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftNov-232 - 2 1/2 sty Terrace
RM1,805,000RM447.174,036 sqftOct-232 - 2 1/2 sty Semi-D
RM940,000RM376.422,497 sqftOct-232 - 2 1/2 sty Terrace
RM866,000RM416.862,077 sqftOct-23Cluster House
RM850,000RM340.382,497 sqftOct-232 - 2 1/2 sty Terrace
RM845,000RM428.981,970 sqftOct-232 - 2 1/2 sty Terrace
RM790,000RM394.592,002 sqftOct-232 - 2 1/2 sty Terrace
RM697,000RM353.841,970 sqftOct-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftOct-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftOct-232 - 2 1/2 sty Terrace
RM866,000RM416.862,077 sqftSep-23Cluster House
RM697,000RM535.151,302 sqftSep-232 - 2 1/2 sty Terrace
RM2,350,000RM742.593,165 sqftAug-23Detached
RM1,150,000RM400.142,874 sqftAug-232 - 2 1/2 sty Semi-D
RM927,000RM446.222,077 sqftAug-23Cluster House
RM866,000RM416.862,077 sqftAug-23Cluster House
RM864,000RM415.92,077 sqftAug-23Cluster House
RM833,000RM400.982,077 sqftAug-23Cluster House
RM803,000RM386.532,077 sqftAug-23Cluster House
RM720,000RM371.611,938 sqftAug-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftAug-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftAug-232 - 2 1/2 sty Terrace
RM923,000RM567.881,625 sqftJul-23Cluster House
RM867,000RM417.342,077 sqftJul-23Cluster House
RM833,000RM400.982,077 sqftJul-23Cluster House
RM803,000RM386.532,077 sqftJul-23Cluster House
RM700,000RM414.221,690 sqftJul-232 - 2 1/2 sty Terrace
RM697,000RM535.151,302 sqftJul-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftJul-232 - 2 1/2 sty Terrace
RM1,681,000RM525.833,197 sqftJun-232 - 2 1/2 sty Semi-D
RM950,000RM474.512,002 sqftJun-232 - 2 1/2 sty Terrace
RM875,000RM444.211,970 sqftJun-232 - 2 1/2 sty Terrace
RM850,000RM431.521,970 sqftJun-232 - 2 1/2 sty Terrace
RM837,000RM402.92,077 sqftJun-23Cluster House
RM837,000RM402.92,077 sqftJun-23Cluster House
RM833,000RM400.982,077 sqftJun-23Cluster House
RM817,000RM393.272,077 sqftJun-23Cluster House
RM702,000RM538.991,302 sqftJun-232 - 2 1/2 sty Terrace
RM697,000RM535.151,302 sqftJun-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftJun-232 - 2 1/2 sty Terrace
RM2,050,000RM647.793,165 sqftMay-23Detached
RM950,000RM372.42,551 sqftMay-232 - 2 1/2 sty Terrace
RM837,000RM402.92,077 sqftMay-23Cluster House
RM833,000RM400.982,077 sqftMay-23Cluster House
RM833,000RM400.982,077 sqftMay-23Cluster House
RM697,000RM535.151,302 sqftMay-231 - 1 1/2 sty Terrace
RM697,000RM535.151,302 sqftMay-232 - 2 1/2 sty Terrace
RM672,000RM515.961,302 sqftMay-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftMay-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftMay-232 - 2 1/2 sty Terrace
RM837,000RM402.92,077 sqftApr-23Cluster House
RM837,000RM402.92,077 sqftApr-23Cluster House
RM833,000RM400.982,077 sqftApr-23Cluster House
RM810,000RM404.582,002 sqftApr-232 - 2 1/2 sty Terrace
RM745,000RM440.851,690 sqftApr-232 - 2 1/2 sty Terrace
RM672,000RM515.961,302 sqftApr-232 - 2 1/2 sty Terrace
RM670,000RM345.811,937 sqftApr-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftApr-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftApr-232 - 2 1/2 sty Terrace
RM2,619,000RM406.26,448 sqftMar-232 - 2 1/2 sty Semi-D
RM1,875,000RM401.374,672 sqftMar-232 - 2 1/2 sty Semi-D
RM1,660,000RM412.354,026 sqftMar-232 - 2 1/2 sty Semi-D
RM1,022,000RM384.42,659 sqftMar-23Cluster House
RM837,000RM402.92,077 sqftMar-23Cluster House
RM837,000RM402.92,077 sqftMar-23Cluster House
RM833,000RM400.982,077 sqftMar-23Cluster House
RM821,000RM395.22,077 sqftMar-23Cluster House
RM820,000RM394.722,077 sqftMar-23Cluster House
RM817,000RM393.272,077 sqftMar-23Cluster House
RM817,000RM393.272,077 sqftMar-23Cluster House
RM697,000RM535.151,302 sqftMar-232 - 2 1/2 sty Terrace
RM697,000RM535.151,302 sqftMar-232 - 2 1/2 sty Terrace
RM697,000RM353.841,970 sqftMar-232 - 2 1/2 sty Terrace
RM672,000RM515.961,302 sqftMar-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftMar-232 - 2 1/2 sty Terrace
RM667,000RM512.121,302 sqftMar-232 - 2 1/2 sty Terrace
RM837,000RM402.92,077 sqftFeb-23Cluster House
RM837,000RM402.92,077 sqftFeb-23Cluster House
RM833,000RM400.982,077 sqftFeb-23Cluster House
RM833,000RM400.982,077 sqftFeb-23Cluster House
RM660,000RM390.551,690 sqftFeb-232 - 2 1/2 sty Terrace
RM1,804,000RM448.124,026 sqftJan-232 - 2 1/2 sty Semi-D
RM1,679,000RM525.23,197 sqftJan-232 - 2 1/2 sty Semi-D
RM833,000RM400.982,077 sqftJan-23Cluster House
RM817,000RM393.272,077 sqftJan-23Cluster House
2022
RM2,888,000RM912.63,165 sqftDec-22Detached
RM1,748,000RM286.416,103 sqftDec-222 - 2 1/2 sty Semi-D
RM1,018,000RM382.92,659 sqftDec-22Cluster House
RM952,000RM358.072,659 sqftDec-22Cluster House
RM837,000RM402.92,077 sqftDec-22Cluster House
RM837,000RM402.92,077 sqftDec-22Cluster House
RM824,000RM396.642,077 sqftDec-22Cluster House
RM821,000RM395.22,077 sqftDec-22Cluster House
RM821,000RM395.22,077 sqftDec-22Cluster House
RM820,000RM394.722,077 sqftDec-22Cluster House
RM817,000RM502.661,625 sqftDec-22Cluster House
RM817,000RM393.272,077 sqftDec-22Cluster House
RM817,000RM393.272,077 sqftDec-22Cluster House
RM806,000RM387.982,077 sqftDec-22Cluster House
RM806,000RM387.982,077 sqftDec-22Cluster House
RM803,000RM386.532,077 sqftDec-22Cluster House
RM2,093,000RM223.59,365 sqftNov-222 - 2 1/2 sty Semi-D
RM917,000RM344.912,659 sqftNov-22Cluster House
RM824,000RM396.642,077 sqftNov-22Cluster House
RM819,000RM503.891,625 sqftNov-22Cluster House
RM803,000RM386.532,077 sqftNov-22Cluster House
RM685,000RM451.341,518 sqftNov-222 - 2 1/2 sty Terrace
RM1,025,000RM356.652,874 sqftOct-222 - 2 1/2 sty Semi-D
RM912,000RM343.032,659 sqftOct-22Cluster House
RM822,000RM505.741,625 sqftOct-22Cluster House
RM720,000RM373.691,927 sqftOct-222 - 2 1/2 sty Terrace
RM927,000RM570.341,625 sqftSep-22Cluster House
RM840,000RM500.251,679 sqftSep-222 - 2 1/2 sty Terrace
RM834,000RM513.121,625 sqftSep-22Cluster House
RM834,000RM401.462,077 sqftSep-22Cluster House
RM834,000RM401.462,077 sqftSep-22Cluster House
RM832,000RM400.492,077 sqftSep-22Cluster House
RM822,000RM505.741,625 sqftSep-22Cluster House
RM822,000RM395.682,077 sqftSep-22Cluster House
RM819,000RM503.891,625 sqftSep-22Cluster House
RM809,000RM497.741,625 sqftSep-22Cluster House
RM809,000RM389.422,077 sqftSep-22Cluster House
RM806,000RM387.982,077 sqftSep-22Cluster House
RM803,000RM386.532,077 sqftSep-22Cluster House
RM797,000RM490.361,625 sqftSep-22Cluster House
RM794,000RM488.511,625 sqftSep-22Cluster House
RM794,000RM382.22,077 sqftSep-22Cluster House
RM794,000RM382.22,077 sqftSep-22Cluster House
RM791,000RM380.762,077 sqftSep-22Cluster House
RM791,000RM380.762,077 sqftSep-22Cluster House
RM788,000RM484.821,625 sqftSep-22Cluster House
RM788,000RM379.312,077 sqftSep-22Cluster House
RM788,000RM379.312,077 sqftSep-22Cluster House
RM682,000RM340.642,002 sqftAug-222 - 2 1/2 sty Terrace
RM2,888,000Jul-22Detached
RM1,941,000RM607.153,197 sqftJul-222 - 2 1/2 sty Semi-D
RM1,729,000RM540.843,197 sqftJul-222 - 2 1/2 sty Semi-D
RM725,000RM340.182,131 sqftJul-222 - 2 1/2 sty Terrace
RM680,000RM319.062,131 sqftJul-222 - 2 1/2 sty Terrace
RM2,619,000RM436.835,995 sqftJun-222 - 2 1/2 sty Semi-D
RM655,000RM390.071,679 sqftJun-222 - 2 1/2 sty Terrace
RM2,569,000RM428.495,995 sqftMay-222 - 2 1/2 sty Semi-D
RM1,640,000RM354.334,628 sqftApr-222 - 2 1/2 sty Semi-D
RM2,098,000RM662.963,165 sqftMar-22Detached
RM1,975,000RM385.475,124 sqftMar-222 - 2 1/2 sty Semi-D
RM1,746,000RM331.045,274 sqftMar-222 - 2 1/2 sty Semi-D
RM980,000RM508.631,927 sqftMar-222 - 2 1/2 sty Terrace
RM700,000RM414.221,690 sqftMar-222 - 2 1/2 sty Terrace
RM1,100,000RM293.663,746 sqftFeb-222 - 2 1/2 sty Semi-D
2021
RM1,770,000RM308.525,737 sqftDec-212 - 2 1/2 sty Semi-D
RM1,590,000RM417.283,810 sqftDec-212 - 2 1/2 sty Semi-D
RM1,280,000RM639.332,002 sqftDec-212 - 2 1/2 sty Terrace
RM820,000RM488.341,679 sqftDec-212 - 2 1/2 sty Terrace
RM773,000RM362.72,131 sqftDec-212 - 2 1/2 sty Terrace
RM750,000RM494.171,518 sqftDec-212 - 2 1/2 sty Terrace
RM720,000RM428.781,679 sqftDec-212 - 2 1/2 sty Terrace
RM710,000RM467.811,518 sqftDec-212 - 2 1/2 sty Terrace
RM600,000RM355.041,690 sqftDec-212 - 2 1/2 sty Terrace
RM1,978,000RM627.183,154 sqftNov-21Detached
RM936,000RM323.262,896 sqftNov-212 - 2 1/2 sty Terrace
RM2,238,000RM707.23,165 sqftOct-21Detached
RM2,078,000RM656.643,165 sqftOct-21Detached
RM1,300,000RM503.232,583 sqftOct-21Cluster House
RM730,000RM376.771,938 sqftSep-212 - 2 1/2 sty Terrace
RM1,762,000RM564.473,122 sqftAug-212 - 2 1/2 sty Semi-D
RM2,268,000RM229.289,892 sqftJul-21Detached
RM2,198,000RM319.066,889 sqftJul-21Detached
RM1,753,000RM561.583,122 sqftJul-212 - 2 1/2 sty Semi-D
RM2,558,000RM808.323,165 sqftJun-21Detached
RM2,268,000RM329.236,889 sqftJun-21Detached
RM1,590,000RM509.373,122 sqftJun-212 - 2 1/2 sty Semi-D
RM1,590,000RM414.933,832 sqftJun-21Detached
RM2,428,000RM237.6910,215 sqftMay-21Detached
RM2,108,000RM206.3610,215 sqftMay-21Detached
RM1,830,000RM586.253,122 sqftMay-212 - 2 1/2 sty Semi-D
RM1,744,000RM558.73,122 sqftMay-212 - 2 1/2 sty Semi-D
RM1,580,000RM506.163,122 sqftMay-212 - 2 1/2 sty Semi-D
RM1,540,000RM493.353,122 sqftMay-212 - 2 1/2 sty Semi-D
RM2,398,000RM304.357,879 sqftApr-21Detached
RM2,368,000RM748.283,165 sqftApr-21Detached
RM1,757,000RM562.863,122 sqftApr-212 - 2 1/2 sty Semi-D
RM2,488,000RM786.23,165 sqftMar-21Detached
RM1,580,000RM506.163,122 sqftMar-212 - 2 1/2 sty Semi-D
RM1,520,000RM486.943,122 sqftMar-212 - 2 1/2 sty Semi-D
RM2,218,000RM281.57,879 sqftFeb-21Detached
RM1,570,000RM223.027,040 sqftJan-21Detached
RM1,530,000RM469.113,261 sqftJan-21Detached
Recent Highest price Highest PSF

Frequently asked

What is the median price of Alam Sari Bangi?

The median registered subsale price at Alam Sari Bangi, Hulu Langat is RM833k (median PSF RM416), based on 253 transactions from 2021 to 2025. Source: NAPIC/JPPH.

Are these real sold prices for Alam Sari Bangi?

Yes — every row is an actual registered sale recorded by NAPIC/JPPH, not an asking or listing price, showing the floor level, price, price-per-sqft, size and month.