MalaysiaProp
Sign in

Scientex Tasek Gelugor

Seberang Perai Utara, Penang

Scientex Tasek Gelugor in Seberang Perai Utara, Penang recorded 290 registered subsale transactions between 2021 and 2023, sized 1,055–2,863 sqft, with a median price of RM297k and a median PSF of RM249. All figures are real registered sales from NAPIC/JPPH — not asking prices.

Transactions

290 subsales
FloorPricePSFSizeDateType
2023
RM309,000RM258.621,195 sqftFeb-232 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftFeb-232 - 2 1/2 sty Terrace
RM308,000RM257.791,195 sqftFeb-232 - 2 1/2 sty Terrace
RM330,000RM276.21,195 sqftJan-232 - 2 1/2 sty Terrace
RM328,000RM274.521,195 sqftJan-232 - 2 1/2 sty Terrace
RM317,000RM265.321,195 sqftJan-232 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftJan-232 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftJan-232 - 2 1/2 sty Terrace
2022
RM334,000RM279.551,195 sqftDec-222 - 2 1/2 sty Terrace
RM317,000RM265.321,195 sqftDec-222 - 2 1/2 sty Terrace
RM312,000RM261.131,195 sqftDec-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftDec-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftDec-222 - 2 1/2 sty Terrace
RM466,000RM390.031,195 sqftNov-222 - 2 1/2 sty Terrace
RM414,000RM346.51,195 sqftNov-222 - 2 1/2 sty Terrace
RM407,000RM340.641,195 sqftNov-222 - 2 1/2 sty Terrace
RM404,000RM338.131,195 sqftNov-222 - 2 1/2 sty Terrace
RM329,000RM275.361,195 sqftNov-222 - 2 1/2 sty Terrace
RM325,000RM272.011,195 sqftNov-222 - 2 1/2 sty Terrace
RM323,000RM270.341,195 sqftNov-222 - 2 1/2 sty Terrace
RM320,000RM267.831,195 sqftNov-222 - 2 1/2 sty Terrace
RM319,000RM266.991,195 sqftNov-222 - 2 1/2 sty Terrace
RM318,000RM266.151,195 sqftNov-222 - 2 1/2 sty Terrace
RM317,000RM265.321,195 sqftNov-222 - 2 1/2 sty Terrace
RM312,000RM261.131,195 sqftNov-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftNov-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftNov-222 - 2 1/2 sty Terrace
RM309,000RM292.931,055 sqftNov-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftNov-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftNov-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftNov-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftNov-222 - 2 1/2 sty Terrace
RM404,000RM338.131,195 sqftOct-222 - 2 1/2 sty Terrace
RM378,000RM316.371,195 sqftOct-222 - 2 1/2 sty Terrace
RM334,000RM279.551,195 sqftOct-222 - 2 1/2 sty Terrace
RM333,000RM278.711,195 sqftOct-222 - 2 1/2 sty Terrace
RM333,000RM278.711,195 sqftOct-222 - 2 1/2 sty Terrace
RM332,000RM277.871,195 sqftOct-222 - 2 1/2 sty Terrace
RM331,000RM277.041,195 sqftOct-222 - 2 1/2 sty Terrace
RM330,000RM276.21,195 sqftOct-222 - 2 1/2 sty Terrace
RM326,000RM272.851,195 sqftOct-222 - 2 1/2 sty Terrace
RM325,000RM272.011,195 sqftOct-222 - 2 1/2 sty Terrace
RM323,000RM270.341,195 sqftOct-222 - 2 1/2 sty Terrace
RM322,000RM269.51,195 sqftOct-222 - 2 1/2 sty Terrace
RM321,000RM268.671,195 sqftOct-222 - 2 1/2 sty Terrace
RM319,000RM266.991,195 sqftOct-222 - 2 1/2 sty Terrace
RM312,000RM261.131,195 sqftOct-222 - 2 1/2 sty Terrace
RM312,000RM261.131,195 sqftOct-222 - 2 1/2 sty Terrace
RM309,000RM292.931,055 sqftOct-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftOct-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftOct-222 - 2 1/2 sty Terrace
RM278,000RM232.681,195 sqftOct-222 - 2 1/2 sty Terrace
RM261,000RM218.451,195 sqftOct-222 - 2 1/2 sty Terrace
RM332,000RM282.971,173 sqftSep-222 - 2 1/2 sty Terrace
RM309,000RM263.371,173 sqftSep-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftSep-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftSep-222 - 2 1/2 sty Terrace
RM252,000RM238.891,055 sqftSep-222 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftSep-222 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftSep-222 - 2 1/2 sty Terrace
RM609,000RM212.72,863 sqftAug-222 - 2 1/2 sty Shop
RM480,000RM401.741,195 sqftAug-222 - 2 1/2 sty Terrace
RM443,000RM370.781,195 sqftAug-222 - 2 1/2 sty Terrace
RM404,000RM382.991,055 sqftAug-222 - 2 1/2 sty Terrace
RM397,000RM372.551,066 sqftAug-222 - 2 1/2 sty Terrace
RM332,000RM282.971,173 sqftAug-222 - 2 1/2 sty Terrace
RM312,000RM261.131,195 sqftAug-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftAug-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftAug-222 - 2 1/2 sty Terrace
RM261,000RM247.431,055 sqftAug-222 - 2 1/2 sty Terrace
RM261,000RM244.931,066 sqftAug-222 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftAug-222 - 2 1/2 sty Terrace
RM659,000RM235.472,799 sqftJul-222 - 2 1/2 sty Shop
RM609,000RM212.72,863 sqftJul-222 - 2 1/2 sty Shop
RM473,000RM395.881,195 sqftJul-222 - 2 1/2 sty Terrace
RM459,000RM435.131,055 sqftJul-222 - 2 1/2 sty Terrace
RM429,000RM359.061,195 sqftJul-222 - 2 1/2 sty Terrace
RM404,000RM382.991,055 sqftJul-222 - 2 1/2 sty Terrace
RM337,000RM282.061,195 sqftJul-222 - 2 1/2 sty Terrace
RM334,000RM279.551,195 sqftJul-222 - 2 1/2 sty Terrace
RM334,000RM279.551,195 sqftJul-222 - 2 1/2 sty Terrace
RM333,000RM278.711,195 sqftJul-222 - 2 1/2 sty Terrace
RM331,000RM277.041,195 sqftJul-222 - 2 1/2 sty Terrace
RM330,000RM276.21,195 sqftJul-222 - 2 1/2 sty Terrace
RM329,000RM275.361,195 sqftJul-222 - 2 1/2 sty Terrace
RM325,000RM272.011,195 sqftJul-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftJul-222 - 2 1/2 sty Terrace
RM300,000RM255.71,173 sqftJul-222 - 2 1/2 sty Terrace
RM300,000RM251.091,195 sqftJul-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftJul-222 - 2 1/2 sty Terrace
RM264,000RM220.961,195 sqftJul-222 - 2 1/2 sty Terrace
RM264,000RM250.271,055 sqftJul-222 - 2 1/2 sty Terrace
RM261,000RM247.431,055 sqftJul-222 - 2 1/2 sty Terrace
RM261,000RM247.431,055 sqftJul-222 - 2 1/2 sty Terrace
RM261,000RM244.931,066 sqftJul-222 - 2 1/2 sty Terrace
RM255,000RM239.31,066 sqftJul-222 - 2 1/2 sty Terrace
RM252,000RM238.891,055 sqftJul-222 - 2 1/2 sty Terrace
RM609,000RM212.72,863 sqftJun-222 - 2 1/2 sty Shop
RM573,000RM200.132,863 sqftJun-222 - 2 1/2 sty Shop
RM452,000RM378.311,195 sqftJun-222 - 2 1/2 sty Terrace
RM451,000RM427.541,055 sqftJun-222 - 2 1/2 sty Terrace
RM415,000RM347.341,195 sqftJun-222 - 2 1/2 sty Terrace
RM404,000RM338.131,195 sqftJun-222 - 2 1/2 sty Terrace
RM350,000RM292.941,195 sqftJun-222 - 2 1/2 sty Terrace
RM337,000RM282.061,195 sqftJun-222 - 2 1/2 sty Terrace
RM337,000RM282.061,195 sqftJun-222 - 2 1/2 sty Terrace
RM334,000RM279.551,195 sqftJun-222 - 2 1/2 sty Terrace
RM334,000RM279.551,195 sqftJun-222 - 2 1/2 sty Terrace
RM329,000RM275.361,195 sqftJun-222 - 2 1/2 sty Terrace
RM322,000RM269.51,195 sqftJun-222 - 2 1/2 sty Terrace
RM320,000RM267.831,195 sqftJun-222 - 2 1/2 sty Terrace
RM316,000RM264.481,195 sqftJun-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftJun-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftJun-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftJun-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftJun-222 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftJun-222 - 2 1/2 sty Terrace
RM261,000RM244.931,066 sqftJun-222 - 2 1/2 sty Terrace
RM252,000RM236.481,066 sqftJun-222 - 2 1/2 sty Terrace
RM689,000RM243.392,831 sqftMay-222 - 2 1/2 sty Shop
RM619,000RM216.192,863 sqftMay-222 - 2 1/2 sty Shop
RM609,000RM212.72,863 sqftMay-222 - 2 1/2 sty Shop
RM573,000RM200.132,863 sqftMay-222 - 2 1/2 sty Shop
RM337,000RM282.061,195 sqftMay-222 - 2 1/2 sty Terrace
RM334,000RM279.551,195 sqftMay-222 - 2 1/2 sty Terrace
RM332,000RM277.871,195 sqftMay-222 - 2 1/2 sty Terrace
RM319,000RM266.991,195 sqftMay-222 - 2 1/2 sty Terrace
RM318,000RM266.151,195 sqftMay-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftMay-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftMay-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftMay-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftMay-222 - 2 1/2 sty Terrace
RM291,000RM243.561,195 sqftMay-222 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftMay-222 - 2 1/2 sty Terrace
RM252,000RM238.891,055 sqftMay-222 - 2 1/2 sty Terrace
RM252,000RM236.481,066 sqftMay-222 - 2 1/2 sty Terrace
RM689,000RM240.642,863 sqftApr-222 - 2 1/2 sty Shop
RM623,000RM220.072,831 sqftApr-222 - 2 1/2 sty Shop
RM609,000RM212.72,863 sqftApr-222 - 2 1/2 sty Shop
RM609,000RM212.72,863 sqftApr-222 - 2 1/2 sty Shop
RM573,000RM200.132,863 sqftApr-222 - 2 1/2 sty Shop
RM433,000RM362.411,195 sqftApr-222 - 2 1/2 sty Terrace
RM321,000RM268.671,195 sqftApr-222 - 2 1/2 sty Terrace
RM319,000RM266.991,195 sqftApr-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftApr-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftApr-222 - 2 1/2 sty Terrace
RM291,000RM243.561,195 sqftApr-222 - 2 1/2 sty Terrace
RM291,000RM243.561,195 sqftApr-222 - 2 1/2 sty Terrace
RM255,000RM239.31,066 sqftApr-222 - 2 1/2 sty Terrace
RM252,000RM238.891,055 sqftApr-222 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftApr-222 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftApr-222 - 2 1/2 sty Terrace
RM454,000RM379.981,195 sqftMar-222 - 2 1/2 sty Terrace
RM435,000RM364.081,195 sqftMar-222 - 2 1/2 sty Terrace
RM392,000RM328.091,195 sqftMar-222 - 2 1/2 sty Terrace
RM368,000RM3081,195 sqftMar-222 - 2 1/2 sty Terrace
RM314,000RM262.811,195 sqftMar-222 - 2 1/2 sty Terrace
RM314,000RM262.811,195 sqftMar-222 - 2 1/2 sty Terrace
RM312,000RM261.131,195 sqftMar-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftMar-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftMar-222 - 2 1/2 sty Terrace
RM300,000RM251.091,195 sqftMar-222 - 2 1/2 sty Terrace
RM300,000RM251.091,195 sqftMar-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftMar-222 - 2 1/2 sty Terrace
RM297,000RM281.551,055 sqftMar-222 - 2 1/2 sty Terrace
RM297,000RM253.141,173 sqftMar-222 - 2 1/2 sty Terrace
RM297,000RM248.581,195 sqftMar-222 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftMar-222 - 2 1/2 sty Terrace
RM255,000RM241.741,055 sqftMar-222 - 2 1/2 sty Terrace
RM252,000RM238.891,055 sqftMar-222 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftMar-222 - 2 1/2 sty Terrace
RM421,000RM352.361,195 sqftJan-222 - 2 1/2 sty Terrace
RM312,000RM261.131,195 sqftJan-222 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftJan-222 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftJan-222 - 2 1/2 sty Terrace
RM264,000RM220.961,195 sqftJan-222 - 2 1/2 sty Terrace
RM255,000RM241.741,055 sqftJan-222 - 2 1/2 sty Terrace
RM255,000RM239.31,066 sqftJan-222 - 2 1/2 sty Terrace
RM252,000RM236.481,066 sqftJan-222 - 2 1/2 sty Terrace
RM252,000RM238.891,055 sqftJan-222 - 2 1/2 sty Terrace
RM252,000RM236.481,066 sqftJan-222 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftJan-222 - 2 1/2 sty Terrace
RM230,000RM215.841,066 sqftJan-222 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftJan-222 - 2 1/2 sty Terrace
2021
RM317,000RM265.321,195 sqftDec-212 - 2 1/2 sty Terrace
RM312,000RM265.921,173 sqftDec-212 - 2 1/2 sty Terrace
RM309,000RM258.621,195 sqftDec-212 - 2 1/2 sty Terrace
RM291,000RM243.561,195 sqftDec-212 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftDec-212 - 2 1/2 sty Terrace
RM264,000RM220.961,195 sqftDec-212 - 2 1/2 sty Terrace
RM264,000RM220.961,195 sqftDec-212 - 2 1/2 sty Terrace
RM255,000RM241.741,055 sqftDec-212 - 2 1/2 sty Terrace
RM255,000RM239.31,066 sqftDec-212 - 2 1/2 sty Terrace
RM252,000RM238.891,055 sqftDec-212 - 2 1/2 sty Terrace
RM252,000RM236.481,066 sqftDec-212 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftDec-212 - 2 1/2 sty Terrace
RM230,000RM215.841,066 sqftDec-212 - 2 1/2 sty Terrace
RM291,000RM243.561,195 sqftNov-212 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftNov-212 - 2 1/2 sty Terrace
RM264,000RM220.961,195 sqftNov-212 - 2 1/2 sty Terrace
RM259,000RM216.771,195 sqftNov-212 - 2 1/2 sty Terrace
RM252,000RM236.481,066 sqftNov-212 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftNov-212 - 2 1/2 sty Terrace
RM294,000RM246.071,195 sqftOct-212 - 2 1/2 sty Terrace
RM291,000RM243.561,195 sqftOct-212 - 2 1/2 sty Terrace
RM267,000RM223.471,195 sqftOct-212 - 2 1/2 sty Terrace
RM255,000RM239.31,066 sqftOct-212 - 2 1/2 sty Terrace
RM252,000RM236.481,066 sqftOct-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftOct-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftOct-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftOct-212 - 2 1/2 sty Terrace
RM368,000RM3081,195 sqftSep-212 - 2 1/2 sty Terrace
RM368,000RM3081,195 sqftSep-212 - 2 1/2 sty Terrace
RM330,000RM309.681,066 sqftSep-212 - 2 1/2 sty Terrace
RM327,000RM306.861,066 sqftSep-212 - 2 1/2 sty Terrace
RM294,000RM246.071,195 sqftSep-212 - 2 1/2 sty Terrace
RM291,000RM243.561,195 sqftSep-212 - 2 1/2 sty Terrace
RM291,000RM243.561,195 sqftSep-212 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftSep-212 - 2 1/2 sty Terrace
RM267,000RM223.471,195 sqftSep-212 - 2 1/2 sty Terrace
RM252,000RM236.481,066 sqftSep-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftSep-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftSep-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftSep-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftSep-212 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftSep-212 - 2 1/2 sty Terrace
RM363,000RM303.821,195 sqftAug-212 - 2 1/2 sty Terrace
RM326,000RM272.851,195 sqftAug-212 - 2 1/2 sty Terrace
RM294,000RM246.071,195 sqftAug-212 - 2 1/2 sty Terrace
RM291,000RM243.561,195 sqftAug-212 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftAug-212 - 2 1/2 sty Terrace
RM252,000RM236.481,066 sqftAug-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftAug-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftAug-212 - 2 1/2 sty Terrace
RM353,000RM334.641,055 sqftJul-212 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftJul-212 - 2 1/2 sty Terrace
RM252,000RM238.891,055 sqftJul-212 - 2 1/2 sty Terrace
RM252,000RM238.891,055 sqftJul-212 - 2 1/2 sty Terrace
RM252,000RM236.481,066 sqftJul-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftJul-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftJul-212 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftJul-212 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftJun-212 - 2 1/2 sty Terrace
RM282,000RM236.021,195 sqftJun-212 - 2 1/2 sty Terrace
RM259,000RM216.771,195 sqftJun-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftJun-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftJun-212 - 2 1/2 sty Terrace
RM403,000RM337.31,195 sqftMay-212 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftMay-212 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftMay-212 - 2 1/2 sty Terrace
RM259,000RM216.771,195 sqftMay-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftMay-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftMay-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftMay-212 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftMay-212 - 2 1/2 sty Terrace
RM317,000RM300.511,055 sqftApr-212 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftApr-212 - 2 1/2 sty Terrace
RM289,000RM241.881,195 sqftApr-212 - 2 1/2 sty Terrace
RM282,000RM240.351,173 sqftApr-212 - 2 1/2 sty Terrace
RM262,000RM219.281,195 sqftApr-212 - 2 1/2 sty Terrace
RM259,000RM216.771,195 sqftApr-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftApr-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftApr-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftApr-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftApr-212 - 2 1/2 sty Terrace
RM247,000RM234.151,055 sqftMar-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftMar-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftMar-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftMar-212 - 2 1/2 sty Terrace
RM236,000RM223.731,055 sqftMar-212 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftMar-212 - 2 1/2 sty Terrace
RM328,000RM310.941,055 sqftFeb-212 - 2 1/2 sty Terrace
RM267,000RM253.111,055 sqftFeb-212 - 2 1/2 sty Terrace
RM253,000RM239.841,055 sqftFeb-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftFeb-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftFeb-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftFeb-212 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftFeb-212 - 2 1/2 sty Terrace
RM340,000RM322.321,055 sqftJan-212 - 2 1/2 sty Terrace
RM312,000RM295.771,055 sqftJan-212 - 2 1/2 sty Terrace
RM289,000RM273.971,055 sqftJan-212 - 2 1/2 sty Terrace
RM270,000RM255.961,055 sqftJan-212 - 2 1/2 sty Terrace
RM253,000RM239.841,055 sqftJan-212 - 2 1/2 sty Terrace
RM247,000RM234.151,055 sqftJan-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftJan-212 - 2 1/2 sty Terrace
RM244,000RM231.311,055 sqftJan-212 - 2 1/2 sty Terrace
RM241,000RM228.471,055 sqftJan-212 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftJan-212 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftJan-212 - 2 1/2 sty Terrace
RM230,000RM218.041,055 sqftJan-212 - 2 1/2 sty Terrace
Recent Highest price Highest PSF

Frequently asked

What is the median price of Scientex Tasek Gelugor?

The median registered subsale price at Scientex Tasek Gelugor, Seberang Perai Utara is RM297k (median PSF RM249), based on 290 transactions from 2021 to 2023. Source: NAPIC/JPPH.

Are these real sold prices for Scientex Tasek Gelugor?

Yes — every row is an actual registered sale recorded by NAPIC/JPPH, not an asking or listing price, showing the floor level, price, price-per-sqft, size and month.