Bandar Botani Parkland in Jasin, Melaka recorded 361 registered subsale transactions between 2021 and 2026, sized 764–4,779 sqft, with a median price of RM300k and a median PSF of RM235.9. All figures are real registered sales from NAPIC/JPPH — not asking prices.

Transactions

361 subsales
FloorPricePSFSizeDateType
2026
RM624,000RM568.351,098 sqftJan-261 - 1 1/2 sty Terrace
RM570,000RM244.032,336 sqftJan-262 - 2 1/2 sty Shop
RM524,000RM380.321,378 sqftJan-26Cluster House
RM272,000RM336.93807 sqftJan-261 - 1 1/2 sty Terrace
2025
RM459,000RM333.141,378 sqftNov-25Cluster House
RM531,000RM385.41,378 sqftOct-251 - 1 1/2 sty Semi-D
RM508,000RM240.792,110 sqftOct-252 - 2 1/2 sty Terrace
RM459,000RM333.141,378 sqftOct-25Cluster House
RM376,000RM342.471,098 sqftOct-251 - 1 1/2 sty Terrace
RM366,000RM333.361,098 sqftOct-251 - 1 1/2 sty Terrace
RM329,000RM299.661,098 sqftOct-251 - 1 1/2 sty Terrace
RM324,000RM295.11,098 sqftOct-251 - 1 1/2 sty Terrace
RM324,000RM153.572,110 sqftSep-252 - 2 1/2 sty Terrace
RM508,000RM240.792,110 sqftAug-252 - 2 1/2 sty Terrace
RM366,000RM333.361,098 sqftAug-251 - 1 1/2 sty Terrace
RM567,000RM411.531,378 sqftJul-25Cluster House
RM531,000RM385.41,378 sqftJul-251 - 1 1/2 sty Semi-D
RM531,000RM461.041,152 sqftJul-251 - 1 1/2 sty Terrace
RM516,000RM147.963,487 sqftJul-251 - 1 1/2 sty Terrace
RM459,000RM333.141,378 sqftJul-25Cluster House
RM437,000RM317.181,378 sqftJul-25Cluster House
RM329,000RM238.791,378 sqftJul-25Cluster House
RM324,000RM295.11,098 sqftJul-251 - 1 1/2 sty Terrace
RM508,000RM240.792,110 sqftApr-252 - 2 1/2 sty Terrace
RM462,000RM335.321,378 sqftApr-25Cluster House
RM457,000RM216.622,110 sqftApr-252 - 2 1/2 sty Terrace
RM324,000RM295.11,098 sqftApr-251 - 1 1/2 sty Terrace
RM324,000RM295.11,098 sqftFeb-251 - 1 1/2 sty Terrace
RM513,000RM372.341,378 sqftJan-25Cluster House
RM480,000RM348.391,378 sqftJan-25Cluster House
RM360,000RM327.891,098 sqftJan-251 - 1 1/2 sty Terrace
RM324,000RM295.11,098 sqftJan-251 - 1 1/2 sty Terrace
2024
RM600,000RM256.882,336 sqftNov-242 - 2 1/2 sty Shop
RM324,000RM295.11,098 sqftNov-241 - 1 1/2 sty Terrace
RM121,000RM151.91797 sqftOct-241 - 1 1/2 sty Terrace
RM480,000RM348.391,378 sqftSep-24Cluster House
RM400,000RM290.321,378 sqftSep-24Cluster House
RM121,000RM151.91797 sqftSep-241 - 1 1/2 sty Terrace
RM679,000RM492.821,378 sqftAug-24Cluster House
RM458,000RM217.092,110 sqftAug-242 - 2 1/2 sty Terrace
RM412,000RM195.292,110 sqftAug-242 - 2 1/2 sty Terrace
RM184,000RM213.68861 sqftAug-241 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftAug-241 - 1 1/2 sty Terrace
RM628,000RM2642,379 sqftJul-242 - 2 1/2 sty Shop
RM480,000RM348.391,378 sqftJul-24Cluster House
RM458,000RM217.092,110 sqftJul-242 - 2 1/2 sty Terrace
RM432,000RM313.551,378 sqftJul-24Cluster House
RM605,000RM259.022,336 sqftJun-242 - 2 1/2 sty Shop
RM600,000RM256.882,336 sqftJun-242 - 2 1/2 sty Shop
RM600,000RM256.882,336 sqftJun-242 - 2 1/2 sty Shop
RM600,000RM256.882,336 sqftJun-242 - 2 1/2 sty Shop
RM551,000RM235.92,336 sqftJun-242 - 2 1/2 sty Shop
RM480,000RM348.391,378 sqftJun-24Cluster House
RM432,000RM313.551,378 sqftJun-24Cluster House
RM412,000RM195.292,110 sqftJun-242 - 2 1/2 sty Terrace
RM410,000RM355.981,152 sqftJun-241 - 1 1/2 sty Terrace
RM184,000RM213.68861 sqftJun-241 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftJun-241 - 1 1/2 sty Terrace
RM595,000RM254.732,336 sqftMay-242 - 2 1/2 sty Shop
RM458,000RM217.092,110 sqftMay-242 - 2 1/2 sty Terrace
RM432,000RM313.551,378 sqftMay-24Cluster House
RM412,000RM195.292,110 sqftMay-242 - 2 1/2 sty Terrace
RM1,013,000RM237.654,263 sqftApr-242 - 2 1/2 sty Shop
RM480,000RM348.391,378 sqftApr-24Cluster House
RM445,000RM322.981,378 sqftApr-24Cluster House
RM412,000RM195.292,110 sqftApr-242 - 2 1/2 sty Terrace
RM181,000RM227.24797 sqftApr-241 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftApr-241 - 1 1/2 sty Terrace
RM694,000RM503.711,378 sqftMar-24Cluster House
RM602,000RM253.072,379 sqftMar-242 - 2 1/2 sty Shop
RM588,000RM4171,410 sqftMar-24Detached
RM480,000RM348.391,378 sqftMar-24Cluster House
RM458,000RM217.092,110 sqftMar-242 - 2 1/2 sty Terrace
RM432,000RM313.551,378 sqftMar-24Cluster House
RM432,000RM313.551,378 sqftMar-24Cluster House
RM412,000RM195.292,110 sqftMar-242 - 2 1/2 sty Terrace
RM180,000RM217.18829 sqftMar-241 - 1 1/2 sty Terrace
RM121,000RM151.91797 sqftMar-241 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftMar-241 - 1 1/2 sty Terrace
RM605,000RM254.332,379 sqftFeb-242 - 2 1/2 sty Shop
RM600,000RM256.882,336 sqftFeb-242 - 2 1/2 sty Shop
RM590,000RM252.592,336 sqftFeb-242 - 2 1/2 sty Shop
RM509,000RM369.441,378 sqftFeb-24Cluster House
RM180,000RM225.98797 sqftFeb-241 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftFeb-241 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftFeb-241 - 1 1/2 sty Terrace
RM598,000RM262.062,282 sqftJan-24Cluster House
RM412,000RM195.292,110 sqftJan-242 - 2 1/2 sty Terrace
RM184,000RM213.68861 sqftJan-241 - 1 1/2 sty Terrace
RM180,000RM225.98797 sqftJan-241 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftJan-241 - 1 1/2 sty Terrace
2023
RM180,000RM225.98797 sqftDec-231 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftDec-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftDec-231 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftNov-231 - 1 1/2 sty Terrace
RM165,000RM207.15797 sqftNov-231 - 1 1/2 sty Terrace
RM124,000RM155.68797 sqftNov-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftNov-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftNov-231 - 1 1/2 sty Terrace
RM677,000RM284.592,379 sqftOct-232 - 2 1/2 sty Shop
RM184,000RM213.68861 sqftOct-231 - 1 1/2 sty Terrace
RM180,000RM225.98797 sqftOct-231 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftOct-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftOct-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftOct-231 - 1 1/2 sty Terrace
RM571,000RM244.462,336 sqftSep-232 - 2 1/2 sty Shop
RM184,000RM213.68861 sqftSep-231 - 1 1/2 sty Terrace
RM181,000RM227.24797 sqftSep-231 - 1 1/2 sty Terrace
RM180,000RM225.98797 sqftSep-231 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftSep-231 - 1 1/2 sty Terrace
RM124,000RM155.68797 sqftSep-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftSep-231 - 1 1/2 sty Terrace
RM120,000RM144.78829 sqftSep-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftSep-231 - 1 1/2 sty Terrace
RM551,000RM235.92,336 sqftAug-232 - 2 1/2 sty Shop
RM184,000RM213.68861 sqftAug-231 - 1 1/2 sty Terrace
RM180,000RM225.98797 sqftAug-231 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftAug-231 - 1 1/2 sty Terrace
RM121,000RM151.91797 sqftAug-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftAug-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftAug-231 - 1 1/2 sty Terrace
RM236,000RM274.06861 sqftJul-231 - 1 1/2 sty Terrace
RM184,000RM213.68861 sqftJul-231 - 1 1/2 sty Terrace
RM184,000RM213.68861 sqftJul-231 - 1 1/2 sty Terrace
RM181,000RM218.38829 sqftJul-231 - 1 1/2 sty Terrace
RM180,000RM225.98797 sqftJul-231 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftJul-231 - 1 1/2 sty Terrace
RM180,000RM209.03861 sqftJul-231 - 1 1/2 sty Terrace
RM172,000RM207.52829 sqftJul-231 - 1 1/2 sty Terrace
RM168,000RM210.92797 sqftJul-231 - 1 1/2 sty Terrace
RM125,000RM156.93797 sqftJul-231 - 1 1/2 sty Terrace
RM124,000RM155.68797 sqftJul-231 - 1 1/2 sty Terrace
RM121,000RM151.91797 sqftJul-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftJul-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftJul-231 - 1 1/2 sty Terrace
RM184,000RM213.68861 sqftJun-231 - 1 1/2 sty Terrace
RM181,000RM227.24797 sqftJun-231 - 1 1/2 sty Terrace
RM180,000RM225.98797 sqftJun-231 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftJun-231 - 1 1/2 sty Terrace
RM176,000RM220.96797 sqftJun-231 - 1 1/2 sty Terrace
RM124,000RM155.68797 sqftJun-231 - 1 1/2 sty Terrace
RM121,000RM151.91797 sqftJun-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftJun-231 - 1 1/2 sty Terrace
RM120,000RM150.65797 sqftJun-231 - 1 1/2 sty Terrace
RM551,000RM235.92,336 sqftApr-232 - 2 1/2 sty Shop
RM423,000RM385.271,098 sqftApr-231 - 1 1/2 sty Terrace
RM370,000RM3371,098 sqftApr-231 - 1 1/2 sty Terrace
RM571,000RM244.462,336 sqftMar-232 - 2 1/2 sty Shop
RM551,000RM235.92,336 sqftMar-232 - 2 1/2 sty Shop
RM144,000RM180.78797 sqftMar-231 - 1 1/2 sty Terrace
RM571,000RM244.462,336 sqftFeb-232 - 2 1/2 sty Shop
RM551,000RM235.92,336 sqftFeb-232 - 2 1/2 sty Shop
RM104,000RM130.57797 sqftFeb-231 - 1 1/2 sty Terrace
RM551,000RM235.92,336 sqftJan-232 - 2 1/2 sty Shop
RM180,000RM217.18829 sqftJan-231 - 1 1/2 sty Terrace
2022
RM571,000RM244.462,336 sqftDec-222 - 2 1/2 sty Shop
RM423,000RM385.271,098 sqftDec-221 - 1 1/2 sty Terrace
RM397,000RM288.141,378 sqftDec-22Cluster House
RM370,000RM3371,098 sqftDec-221 - 1 1/2 sty Terrace
RM551,000RM235.92,336 sqftNov-222 - 2 1/2 sty Shop
RM490,000RM446.31,098 sqftNov-221 - 1 1/2 sty Terrace
RM423,000RM385.271,098 sqftNov-221 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftNov-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftNov-221 - 1 1/2 sty Terrace
RM104,000RM130.57797 sqftNov-221 - 1 1/2 sty Terrace
RM571,000RM244.462,336 sqftOct-222 - 2 1/2 sty Shop
RM551,000RM235.92,336 sqftOct-222 - 2 1/2 sty Shop
RM412,000RM375.261,098 sqftOct-221 - 1 1/2 sty Terrace
RM370,000RM3371,098 sqftOct-221 - 1 1/2 sty Terrace
RM192,000RM241.05797 sqftOct-221 - 1 1/2 sty Terrace
RM180,000RM225.98797 sqftOct-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftOct-221 - 1 1/2 sty Terrace
RM104,000RM130.57797 sqftOct-221 - 1 1/2 sty Terrace
RM104,000RM79.851,302 sqftOct-221 - 1 1/2 sty Terrace
RM423,000RM385.271,098 sqftSep-221 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftSep-221 - 1 1/2 sty Terrace
RM181,000RM218.38829 sqftSep-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftSep-221 - 1 1/2 sty Terrace
RM180,000RM209.03861 sqftSep-221 - 1 1/2 sty Terrace
RM104,000RM130.57797 sqftSep-221 - 1 1/2 sty Terrace
RM677,000RM284.592,379 sqftAug-222 - 2 1/2 sty Shop
RM551,000RM235.92,336 sqftAug-222 - 2 1/2 sty Shop
RM404,000RM293.231,378 sqftAug-22Cluster House
RM370,000RM3371,098 sqftAug-221 - 1 1/2 sty Terrace
RM306,000RM278.711,098 sqftAug-221 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftAug-221 - 1 1/2 sty Terrace
RM181,000RM218.38829 sqftAug-221 - 1 1/2 sty Terrace
RM180,000RM225.98797 sqftAug-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftAug-221 - 1 1/2 sty Terrace
RM118,000RM148.14797 sqftAug-221 - 1 1/2 sty Terrace
RM104,000RM130.57797 sqftAug-221 - 1 1/2 sty Terrace
RM104,000RM79.851,302 sqftAug-221 - 1 1/2 sty Terrace
RM676,000RM289.412,336 sqftJul-222 - 2 1/2 sty Shop
RM551,000RM235.92,336 sqftJul-222 - 2 1/2 sty Shop
RM418,000RM303.391,378 sqftJul-22Cluster House
RM405,000RM293.951,378 sqftJul-22Cluster House
RM370,000RM3371,098 sqftJul-221 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftJul-221 - 1 1/2 sty Terrace
RM243,000RM221.331,098 sqftJul-221 - 1 1/2 sty Terrace
RM184,000RM213.68861 sqftJul-221 - 1 1/2 sty Terrace
RM181,000RM218.38829 sqftJul-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftJul-221 - 1 1/2 sty Terrace
RM118,000RM148.14797 sqftJul-221 - 1 1/2 sty Terrace
RM118,000RM90.61,302 sqftJul-221 - 1 1/2 sty Terrace
RM104,000RM130.57797 sqftJul-221 - 1 1/2 sty Terrace
RM104,000RM79.851,302 sqftJul-221 - 1 1/2 sty Terrace
RM551,000RM235.92,336 sqftJun-222 - 2 1/2 sty Shop
RM551,000RM231.632,379 sqftJun-222 - 2 1/2 sty Shop
RM444,000RM322.261,378 sqftJun-22Cluster House
RM404,000RM293.231,378 sqftJun-22Cluster House
RM400,000RM364.331,098 sqftJun-221 - 1 1/2 sty Terrace
RM397,000RM288.141,378 sqftJun-22Cluster House
RM306,000RM278.711,098 sqftJun-221 - 1 1/2 sty Terrace
RM303,000RM275.981,098 sqftJun-221 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftJun-221 - 1 1/2 sty Terrace
RM228,000RM275.09829 sqftJun-221 - 1 1/2 sty Terrace
RM181,000RM218.38829 sqftJun-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftJun-221 - 1 1/2 sty Terrace
RM119,000RM149.4797 sqftJun-221 - 1 1/2 sty Terrace
RM118,000RM148.14797 sqftJun-221 - 1 1/2 sty Terrace
RM104,000RM130.57797 sqftJun-221 - 1 1/2 sty Terrace
RM571,000RM244.462,336 sqftMay-222 - 2 1/2 sty Shop
RM571,000RM244.462,336 sqftMay-222 - 2 1/2 sty Shop
RM510,000RM370.161,378 sqftMay-22Cluster House
RM423,000RM385.271,098 sqftMay-221 - 1 1/2 sty Terrace
RM397,000RM288.141,378 sqftMay-22Cluster House
RM306,000RM278.711,098 sqftMay-221 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftMay-221 - 1 1/2 sty Terrace
RM190,000RM229.24829 sqftMay-221 - 1 1/2 sty Terrace
RM184,000RM240.76764 sqftMay-221 - 1 1/2 sty Terrace
RM184,000RM222829 sqftMay-221 - 1 1/2 sty Terrace
RM184,000RM213.68861 sqftMay-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftMay-221 - 1 1/2 sty Terrace
RM152,000RM190.83797 sqftMay-221 - 1 1/2 sty Terrace
RM152,000RM116.71,302 sqftMay-221 - 1 1/2 sty Terrace
RM127,000RM159.44797 sqftMay-221 - 1 1/2 sty Terrace
RM104,000RM130.57797 sqftMay-221 - 1 1/2 sty Terrace
RM104,000RM79.851,302 sqftMay-221 - 1 1/2 sty Terrace
RM416,000RM424.7980 sqftApr-22Detached
RM306,000RM278.711,098 sqftApr-221 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftApr-221 - 1 1/2 sty Terrace
RM228,000RM275.09829 sqftApr-221 - 1 1/2 sty Terrace
RM228,000RM275.09829 sqftApr-221 - 1 1/2 sty Terrace
RM185,000RM223.21829 sqftApr-221 - 1 1/2 sty Terrace
RM184,000RM213.68861 sqftApr-221 - 1 1/2 sty Terrace
RM184,000RM167.591,098 sqftApr-221 - 1 1/2 sty Terrace
RM181,000RM218.38829 sqftApr-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftApr-221 - 1 1/2 sty Terrace
RM174,000RM218.45797 sqftApr-221 - 1 1/2 sty Terrace
RM152,000RM190.83797 sqftApr-221 - 1 1/2 sty Terrace
RM118,000RM148.14797 sqftApr-221 - 1 1/2 sty Terrace
RM105,000RM131.82797 sqftApr-221 - 1 1/2 sty Terrace
RM104,000RM130.57797 sqftApr-221 - 1 1/2 sty Terrace
RM104,000RM125.48829 sqftApr-221 - 1 1/2 sty Terrace
RM104,000RM79.851,302 sqftApr-221 - 1 1/2 sty Terrace
RM571,000RM240.032,379 sqftMar-222 - 2 1/2 sty Shop
RM442,000RM320.811,378 sqftMar-22Cluster House
RM397,000RM288.141,378 sqftMar-22Cluster House
RM370,000RM3371,098 sqftMar-221 - 1 1/2 sty Terrace
RM306,000RM278.711,098 sqftMar-221 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftMar-221 - 1 1/2 sty Terrace
RM236,000RM274.06861 sqftMar-221 - 1 1/2 sty Terrace
RM184,000RM213.68861 sqftMar-221 - 1 1/2 sty Terrace
RM181,000RM218.38829 sqftMar-221 - 1 1/2 sty Terrace
RM180,000RM225.98797 sqftMar-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftMar-221 - 1 1/2 sty Terrace
RM168,000RM210.92797 sqftMar-221 - 1 1/2 sty Terrace
RM154,000RM193.34797 sqftMar-221 - 1 1/2 sty Terrace
RM152,000RM190.83797 sqftMar-221 - 1 1/2 sty Terrace
RM118,000RM148.14797 sqftMar-221 - 1 1/2 sty Terrace
RM118,000RM90.61,302 sqftMar-221 - 1 1/2 sty Terrace
RM105,000RM131.82797 sqftMar-221 - 1 1/2 sty Terrace
RM104,000RM130.57797 sqftMar-221 - 1 1/2 sty Terrace
RM104,000RM79.851,302 sqftMar-221 - 1 1/2 sty Terrace
RM1,250,000RM261.554,779 sqftFeb-222 - 2 1/2 sty Shop
RM677,000RM284.592,379 sqftFeb-222 - 2 1/2 sty Shop
RM663,000RM278.712,379 sqftFeb-222 - 2 1/2 sty Shop
RM571,000RM244.462,336 sqftFeb-222 - 2 1/2 sty Shop
RM571,000RM240.032,379 sqftFeb-222 - 2 1/2 sty Shop
RM551,000RM235.92,336 sqftFeb-222 - 2 1/2 sty Shop
RM551,000RM231.632,379 sqftFeb-222 - 2 1/2 sty Shop
RM531,000RM227.332,336 sqftFeb-222 - 2 1/2 sty Shop
RM300,000RM273.241,098 sqftFeb-221 - 1 1/2 sty Terrace
RM300,000RM217.741,378 sqftFeb-22Cluster House
RM228,000RM275.09829 sqftFeb-221 - 1 1/2 sty Terrace
RM228,000RM275.09829 sqftFeb-221 - 1 1/2 sty Terrace
RM184,000RM222829 sqftFeb-221 - 1 1/2 sty Terrace
RM184,000RM213.68861 sqftFeb-221 - 1 1/2 sty Terrace
RM180,000RM225.98797 sqftFeb-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftFeb-221 - 1 1/2 sty Terrace
RM152,000RM190.83797 sqftFeb-221 - 1 1/2 sty Terrace
RM152,000RM190.83797 sqftFeb-221 - 1 1/2 sty Terrace
RM105,000RM131.82797 sqftFeb-221 - 1 1/2 sty Terrace
RM104,000RM130.57797 sqftFeb-221 - 1 1/2 sty Terrace
RM571,000RM244.462,336 sqftJan-222 - 2 1/2 sty Shop
RM571,000RM244.462,336 sqftJan-222 - 2 1/2 sty Shop
RM551,000RM235.92,336 sqftJan-222 - 2 1/2 sty Shop
RM397,000RM288.141,378 sqftJan-22Cluster House
RM300,000RM273.241,098 sqftJan-221 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftJan-221 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftJan-221 - 1 1/2 sty Terrace
RM236,000RM284.74829 sqftJan-221 - 1 1/2 sty Terrace
RM193,000RM242.3797 sqftJan-221 - 1 1/2 sty Terrace
RM185,000RM214.84861 sqftJan-221 - 1 1/2 sty Terrace
RM184,000RM240.76764 sqftJan-221 - 1 1/2 sty Terrace
RM184,000RM222829 sqftJan-221 - 1 1/2 sty Terrace
RM184,000RM213.68861 sqftJan-221 - 1 1/2 sty Terrace
RM181,000RM218.38829 sqftJan-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftJan-221 - 1 1/2 sty Terrace
RM180,000RM217.18829 sqftJan-221 - 1 1/2 sty Terrace
RM152,000RM190.83797 sqftJan-221 - 1 1/2 sty Terrace
RM152,000RM190.83797 sqftJan-221 - 1 1/2 sty Terrace
RM152,000RM116.71,302 sqftJan-221 - 1 1/2 sty Terrace
RM127,000RM159.44797 sqftJan-221 - 1 1/2 sty Terrace
RM118,000RM148.14797 sqftJan-221 - 1 1/2 sty Terrace
RM118,000RM90.61,302 sqftJan-221 - 1 1/2 sty Terrace
RM105,000RM131.82797 sqftJan-221 - 1 1/2 sty Terrace
RM104,000RM130.57797 sqftJan-221 - 1 1/2 sty Terrace
RM104,000RM125.48829 sqftJan-221 - 1 1/2 sty Terrace
RM104,000RM79.851,302 sqftJan-221 - 1 1/2 sty Terrace
2021
RM677,000RM284.592,379 sqftDec-212 - 2 1/2 sty Shop
RM580,000RM528.271,098 sqftDec-211 - 1 1/2 sty Terrace
RM571,000RM244.462,336 sqftDec-212 - 2 1/2 sty Shop
RM558,000RM234.572,379 sqftDec-212 - 2 1/2 sty Shop
RM551,000RM231.632,379 sqftDec-212 - 2 1/2 sty Shop
RM453,000RM328.791,378 sqftDec-21Cluster House
RM451,000RM327.341,378 sqftDec-211 - 1 1/2 sty Terrace
RM444,000RM322.261,378 sqftDec-21Cluster House
RM442,000RM320.811,378 sqftDec-21Cluster House
RM432,000RM313.551,378 sqftDec-21Cluster House
RM423,000RM385.271,098 sqftDec-211 - 1 1/2 sty Terrace
RM423,000RM307.021,378 sqftDec-211 - 1 1/2 sty Terrace
RM418,000RM303.391,378 sqftDec-211 - 1 1/2 sty Semi-D
RM418,000RM303.391,378 sqftDec-21Cluster House
RM412,000RM299.031,378 sqftDec-21Cluster House
RM405,000RM293.951,378 sqftDec-21Cluster House
RM404,000RM293.231,378 sqftDec-21Cluster House
RM404,000RM293.231,378 sqftDec-21Cluster House
RM397,000RM288.141,378 sqftDec-21Cluster House
RM394,000RM358.861,098 sqftDec-211 - 1 1/2 sty Terrace
RM370,000RM3371,098 sqftDec-211 - 1 1/2 sty Terrace
RM306,000RM278.711,098 sqftDec-211 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftDec-211 - 1 1/2 sty Terrace
RM1,057,000RM247.984,262 sqftNov-212 - 2 1/2 sty Shop
RM927,000RM396.872,336 sqftNov-212 - 2 1/2 sty Shop
RM663,000RM278.712,379 sqftNov-212 - 2 1/2 sty Shop
RM571,000RM244.462,336 sqftNov-212 - 2 1/2 sty Shop
RM571,000RM240.032,379 sqftNov-212 - 2 1/2 sty Shop
RM571,000RM244.462,336 sqftNov-212 - 2 1/2 sty Shop
RM558,000RM238.892,336 sqftNov-212 - 2 1/2 sty Shop
RM551,000RM235.92,336 sqftNov-212 - 2 1/2 sty Shop
RM418,000RM303.391,378 sqftNov-211 - 1 1/2 sty Semi-D
RM418,000RM320.941,302 sqftNov-21Cluster House
RM418,000RM303.391,378 sqftNov-21Cluster House
RM405,000RM293.951,378 sqftNov-21Cluster House
RM404,000RM293.231,378 sqftNov-21Cluster House
RM397,000RM288.141,378 sqftNov-21Cluster House
RM380,000RM346.111,098 sqftNov-211 - 1 1/2 sty Terrace
RM370,000RM3371,098 sqftNov-211 - 1 1/2 sty Terrace
RM306,000RM278.711,098 sqftNov-211 - 1 1/2 sty Terrace
RM300,000RM273.241,098 sqftNov-211 - 1 1/2 sty Terrace
Recent Highest price Highest PSF

Frequently asked

What is the median price of Bandar Botani Parkland?

The median registered subsale price at Bandar Botani Parkland, Jasin is RM300k (median PSF RM235.9), based on 361 transactions from 2021 to 2026. Source: NAPIC/JPPH.

Are these real sold prices for Bandar Botani Parkland?

Yes — every row is an actual registered sale recorded by NAPIC/JPPH, not an asking or listing price, showing the floor level, price, price-per-sqft, size and month.